Log in
Forum » Europe – Eastern
Topic

Hose bibs- permanent irrigation

CS-2009 WEc1: Water Efficient Landscaping
posted by Petra Hajná on Apr 18, 2016, 8:31 am

Hi LEEDers.
I tried to pursue the credit via calculation because the roject will use the hose bibs on regular basis for the building lifetime, not as a temporary solution. When I asked...

Last reply: Petra Hajná, Aug 2, 2016, 7:19 am

Recycled content in road underlay material

NC-2009 MRc4: Recycled Content
posted by Agnieszka Rylska on Jul 29, 2016, 5:55 am

In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in...

Last reply: Agnieszka Rylska, Aug 1, 2016, 6:29 am

CxA contract

CS-2009 EAc3: Enhanced Commissioning
posted by Agnieszka Rylska on May 23, 2016, 9:03 am

Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (...

Last reply: David Edenburn, Jul 26, 2016, 10:35 pm

dedicated exhaust

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Agnieszka Rylska on Feb 8, 2016, 6:51 am

I would like to make sure what does "dedicated/designated exhaust" mean. Can all hazardous gas and chemical use areas have one exhaust system combined with the exhaust from toilets or does every...

Last reply: Lyle Axelarris, Jul 25, 2016, 4:14 pm

Baseline System 9 fan details

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Jul 4, 2016, 7:45 am

Greetings,
We have zones in our project which are addressed to system 9 (heating only). The heating source is purchased heat, which is to be applied also in the Baseline.
The proposed...

Last reply: Marcus Sheffer, Jul 5, 2016, 9:48 am

ASHRAE requirements for dry-coolers

CS-2009 EAp2: Minimum Energy Performance
posted by Agnieszka Rylska on Jun 29, 2016, 9:30 am

Cooling system in our project (shopping mall) consists of dry-coolers sprayed with water. What are ASHRAE efficiency requirements for dry-coolers? Should they be qualified as air-cooled...

Last reply: Agnieszka Rylska, Jul 4, 2016, 3:38 am

producer declaration

CS-2009 MRc4: Recycled Content
posted by Agnieszka Rylska on Jun 30, 2016, 5:33 am

We received a declaration from a material producer stating that the product "contains ca. 80%...

Last reply: Jon Clifford, Jun 30, 2016, 10:30 pm

Distance from windows to area

CI-2009 IEQc8.1: Daylight and views - daylight
posted by Rustem Saitov on Jun 24, 2016, 4:33 am

Hi,

We are taking 3rd option, measurement to show compliance with the credit requirements.
The text of the credit does not postulate when a regularly occupied area can be considered...

Last reply: TODD REED, Jun 27, 2016, 9:48 am

revolving doors and side entrances

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Agnieszka Rylska on Jun 10, 2016, 8:51 am

I am working on a project (shopping mall) that will have revolving door as the mail entrance and it will be equipped with a permanent walk-off system. However there are also side doors on each...

Last reply: Michelle Halle Stern, Jun 18, 2016, 9:59 am

parking demand vs 1000sf or vs employees

General forums
posted by Agnieszka Rylska on Dec 4, 2015, 4:11 am

We are working on a project that is a warehouse. In the Parking Generation study there are two startegies presented for calculation of average parking demand: one based on the number of employees...

Last reply: Erin Holdenried, Jun 13, 2016, 9:55 pm