Log in
Forum » Credit Forums
Topic

Re: Ashrae 55 for Workout Room/Gym

NC-2009 IEQc7.1: Thermal comfort - design
posted by James Del Monaco on Oct 21, 2010, 5:06 pm

I have a CI project which is approximately 31,000 SF of mostly office space. There is a 600 SF workout room and the remaining are all offices, conference rooms, and other standard office type...

Last reply: Gail Vittori, Nov 2, 2011, 3:04 pm

Document Checklist

CI-2009 MRc5: Regional Materials
posted by Sheela I on Nov 2, 2011, 1:58 pm

Can we use the forms attached in document checklist for tracking purposes?

Last reply: Tristan Roberts, Nov 2, 2011, 2:03 pm

% Regional

CI-2009 MRc5: Regional Materials
posted by Beth Cheuvront on Apr 28, 2011, 2:25 pm

For this credit the form has three columns -
Column 1 - % Regional
Colum 2 - Extraction Miles
Column 3 - Manufactured miles

We are not going for the regionally extracted...

Last reply: Sheela I, Nov 2, 2011, 2:01 pm

LED lamp documentation

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Erin Holdenried on Sep 6, 2011, 4:42 pm

I am working on a project whose majority of fixtures are LED. I am wondering what the LED equivalent to a...

Last reply: Erin Holdenried, Nov 2, 2011, 1:51 pm

CO2 testing

EBOM-2009 IEQc1.2: Indoor air quality best management practices - outdoor air delivery monitoring
posted by Victor Liu on Sep 7, 2011, 4:34 pm

Need to know if I need to do a CO2 test on Case 1 Mechanically Ventilated spaces.

Last reply: Tristan Roberts, Nov 2, 2011, 12:26 pm

Cans or Packed Food

EBOM-2009 MRc5: Sustainable purchasing - food
posted by Simon Sue on Dec 21, 2010, 4:30 am

Most restaurant will have inventories on Cans or packed food, especially for tomatoes sources, sweet corns, sausages, etc.

if these food was manufactured within 100miles, will it be...

Last reply: Ravi Bajaj, Nov 1, 2011, 8:25 pm

Points for Provision of "Sun Pipes" Under innovation

NC-2009 IDc1: Innovation in Design
posted by Yong Lee Low on Oct 5, 2011, 3:36 am

I am working on a factory project at Jakarta, Indonesia. They are using Sun Pipes to illuminate the work spaces in the office area(at level 2). The sunlight is captured from the roof and duct-ed...

Last reply: David Posada, Nov 1, 2011, 7:41 pm

Who may contract "Construction manager not holding contracts"?

NC-2009 EAc3: Enhanced Commissioning
posted by Jean Marais on May 26, 2010, 1:15 am

Am I right in understanding that for Enhanced Commissioing only the following may subcontract the...

Last reply: Bethany Beers, Nov 1, 2011, 6:28 pm

Square footage calculation

CI-2009 IEQc8.1: Daylight and views - daylight
posted by Michael E. Edmonds-Bauer on Nov 1, 2011, 3:56 pm

We have 4'' wide wall partitions between spaces. Should we include the floor surface occupied by the wall in the square footage calculation of a space? Considering that the wall area would never...

Last reply: Emily Catacchio, Nov 1, 2011, 6:00 pm

Modeling DOAS System efficiencies

NC-2009 EAp2: Minimum Energy Performance
posted by Brandon Frey on Nov 1, 2011, 3:33 pm

I am modeling a geothermal heat pump system with a geothermal heat pump DOAS unit. The DOAS unit will be connected to the geothermal loop and will only provide 75 degree outside air to each heat...

Last reply: Christopher Schaffner, Nov 1, 2011, 5:31 pm