Topic

Who says you cant get a

NC-2009 WEp1: Water Use Reduction
posted by Neil Rosen on Mar 17, 2010, 5:46 am

Who says you cant get a laminar flow gooseneck at 0.5GPM...??? They are available from multiple manufacturers

Last reply: Neil Rosen, Mar 17, 2010, 12:25 pm

CxA for Enhanced...

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jean Marais on Mar 4, 2010, 5:29 am

PARTIES EXCLUDED FROM APPLYING
The following are disqualified from applying:
1. Employee or subcontractor of general contractor with construction responsibilities
2. Employee or...

Last reply: Karen Stewart, Mar 16, 2010, 11:53 am

Video on understanding LEED CMP program (GBCI)

NC-2009 IDc2: LEED Accredited Professional
posted by Tristan Roberts on Mar 15, 2010, 10:24 am

Hi, the free webinar that I mention in a couple of the comments on this credit is now posted on LEEDuser, here. Enjoy—and you can also...

Faucets at Gallons per Cycle vs. Gallons per Minute

NC-2009 WEp1: Water Use Reduction
posted by Dave Intner on Feb 26, 2010, 1:25 pm

It seems to me that there is a large discrepancy in the baseline for gallons per minute versus gallons per cycle.

The LEED Online template states "When using the metering lavatory faucet...

Last reply: Dave Intner, Mar 12, 2010, 6:49 pm

ISSUE Part 2

CI-2009 IEQp1: Minimum IAQ Performance
posted by Elizabeth Repin on Jan 26, 2010, 1:19 pm

This is taken from ASHRAE 62.1 2007 USERS MANUAL, Page 93
Example 6-E—Occasionally Occupied Spaces

Q
Table 6-1 lists ventilation requirements for infrequently
occupied...

Last reply: Gunnar Hubbard, Mar 12, 2010, 3:30 pm

Occupant Comfort Levels

EBOM-2009 IEQc2.1: Occupant Comfort—Occupant Survey
posted by RASHID HAMEEN on Mar 11, 2010, 2:26 am

Will it be sufficient enough to conduct the survey and to document it to obtain this credit..Does it require to invest on equipments to improve the air quality as most probably we are not planing...

Last reply: Tristan Roberts, Mar 11, 2010, 11:31 am

building complete 1993 or later

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Rachael McClain on Mar 10, 2010, 1:47 pm

I am confused by the table above with the tab that says building completed 1993 or later its says the baseline is 160%, the table also has a tab that says fixtures installed after 1993 or later,...

Last reply: Jason Franken, Mar 11, 2010, 10:55 am

Estabilishing the Energy use baseline

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by RASHID HAMEEN on Mar 9, 2010, 4:43 am

we are a Sri Lankan company and we are planning on going for LEEDS EB OM certification. As we are a foreign entity we are facing problems on how to establish the Energy use base line.Further if...

Last reply: Jenny Carney, Mar 10, 2010, 9:45 am

SMACNA Chapter 3... Occupied buildings only?

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Rouba Nassar on Mar 5, 2010, 11:39 am

Hi,
The...

Last reply: David Posada, Mar 9, 2010, 2:06 pm

Definition of non-potable

EBOM-2009 WEc3: Water Efficient Landscaping
posted by Jeff Buitendorp on Mar 4, 2010, 7:24 am

We have a facility that has a well system for irrigation only. The water has been tested and is not suitable for drinking without shock treating the well. The facility is on a municipal supply...

Last reply: Corinna Kester, Mar 7, 2010, 7:33 pm