Topic | Recent |
---|---|
Does GreenPro (TM) meet LEED standard?EBOM-2009 IEQc3.6: Green cleaning - indoor integrated pest managementposted by Jennifer de Mooy on Sep 13, 2012, 2:13 pm
I am trying to determine if the GreenPro (TM) certification through NMPA meets the LEED requirements. Pest management is contracted out for the building we are seeking certification, and the... Last reply: Megan Meiklejohn, Sep 28, 2012, 4:12 pm |
|
U-values soil and vegetationNC-2009 EAp2: Minimum Energy Performanceposted by John Covello on Sep 26, 2012, 4:53 am
Hello, We are working with and energy modeling software that does not have U-values for a soil or vegetated roof. Is there an official list (database) like ASHRAE LEED uses? Right now they... Last reply: Marcus Sheffer, Sep 28, 2012, 3:18 pm |
|
90.1 compliance mandatory? Planned use of empty space?NC-2009 EAp2: Minimum Energy Performanceposted by David Weigel, PE on Sep 28, 2012, 9:02 am
Sorry for a couple of elementary questions, but my searches haven't been successful. 1. Is 90.1 compliance required, or only the mandatory provisions? 2. I have three floors that... Last reply: Marcus Sheffer, Sep 28, 2012, 3:16 pm |
|
Below Grade Garage Exhaust with CO MonitoringNC-2009 EAp2: Minimum Energy Performanceposted by Lorey Flick on Sep 27, 2012, 10:22 am
Condition: I have a completely unconditioned garage located in the cellar. There is no heating. No cooling. Only an exhaust fan and an opening in the entry gate to the garage to provide... Last reply: Marcus Sheffer, Sep 28, 2012, 3:08 pm |
|
Prop 65 Restrictions in IEQ 4 Group 1LEED for Healthcare forumposted by Bruce Maine on Aug 16, 2012, 9:13 am
Good morning. I'm having trouble geting my arms around the requirement that adhesives and... Last reply: Susan Walter, Sep 28, 2012, 1:56 pm |
|
Campus Project- With Only one Building to be LEED certifiedLEED Guidance for Campuses and Multiple Buildingsposted by Udana Ratnayake on Jun 19, 2012, 1:21 am
I'm working on project where there are three buildings (main building and two other support service building) in the same site. Project owner is only interested in obtaining LEED certification... Last reply: Adrienn Gelesz, Sep 28, 2012, 10:19 am |
|
Residential Blower Door Test resultsCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Cory Benson on Sep 19, 2012, 1:13 pm
Our Blower door tests of the residential top floor of a mixed use building reports the findings as Total Airflow through the door seals [m3/h] at a given pressure differential [Pa]. The also... Last reply: Mark Frey, Sep 28, 2012, 5:48 am |
|
Pursuing EBOM IEQc2.4: Daylight and Views as NC ID creditNC-2009 IDc1: Innovation in Designposted by Janene Bolt on Sep 27, 2012, 4:59 pm
In our LEED 2009 NC project, can we pursue... Last reply: Tristan Roberts, Sep 27, 2012, 10:58 pm |
|
"Site energy" usage for a multiple building projectEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Chris Miller on Sep 25, 2012, 10:09 pm
A small site has two office buildings, a storage building and parking lot. For this multiple building project (not campus) seeking LEED EB-O+M certification, energy usage data from each building... Last reply: Chris Miller, Sep 27, 2012, 9:56 pm |
|
SSCr2- Option 2 LEED ReviewNC-2009 SSc2: Development Density and Community Connectivityposted by Thomas Boyd on Jan 16, 2012, 8:00 am
Just received comments back from... Last reply: Caroline O'Leary, Sep 27, 2012, 6:23 pm |