Natural ventilation for 100% outside air?NC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Heather Holdridge on Nov 1, 2012, 5:52 pm
... Last reply: Dylan Connelly, Nov 2, 2012, 7:58 pm |
|
Private terraceCS-2009 SSc5.1: Site development - protect or restore habitatposted by Marcio Alberto Casado Pereira on Sep 24, 2012, 2:42 pm
My C&S project has a terrace on the 1st floor (below there is only the parking garage). That terrace is only accessible by the Meeting Room, which is used by the building users. The meeting... Last reply: Tristan Roberts, Nov 2, 2012, 1:37 pm |
|
Fan power in Proposed ModelCS-2009 EAp2: Minimum Energy Performanceposted by TOMAS URIBE on Oct 8, 2012, 6:47 pm
Hello, I'm working in a C&S project where I have a partial desing of Air conditioned. The owner will give cold water and outdoor air in each tenant space. The desing has supply outdoor... Last reply: Ron Dean, Nov 2, 2012, 12:23 pm |
|
Letters to Material Suppliers & othersLEED for Homes (LEED-H) Forumposted by Donald Morrill on Oct 4, 2012, 12:08 am
Dear Tristan, Last reply: Peggy White, Nov 2, 2012, 12:11 pm |
|
Updating the LEEDOnline form after being acceptedNC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Oct 31, 2012, 11:04 am
Dear All, If the USGBC awards 4 points under EA Credit 1, but then the design team decides to add significant lighting to the project which will increase the Proposed consumption (and... Last reply: Marcus Sheffer, Nov 2, 2012, 9:33 am |
|
Pedestrian ConnectivityPilot-Credits PC9: Street Networkposted by Shiva Prakash on Nov 2, 2012, 9:29 am
I agree with comments made regarding the intent of the credit including pedestrian access. It seems to me that this is where the Street Network Pilot Credit can distinguish itself from other... |
|
Cellulose-based paper productsNC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Anders Olson on Oct 30, 2012, 9:09 am
The project I am working on has specified a number of products that contain cellulose-based paper, including decorative laminates, signage material and ceiling tiles. Some of them also contain... Last reply: Josh Jacobs, Nov 2, 2012, 8:13 am |
|
Does PPR piping need insulation?NC-2009 EAp2: Minimum Energy Performanceposted by Rudolph Carneiro on Nov 1, 2012, 2:42 pm
We have run into a situation with piping material used in a hotwater distribution system. Our client is using Polypropelene piping. (PPR) Last reply: Marcus Sheffer, Nov 1, 2012, 5:48 pm |
|
Energy Modeling for DMV Inspection StationNC-2009 EAp2: Minimum Energy Performanceposted by Maria Fiorelli on Nov 1, 2012, 4:29 pm
We have a project in question that is DMV office and vehicle inspection station. The vehicle inspection lanes side of the building are approximately 50% of the total project square footage. The... Last reply: Marcus Sheffer, Nov 1, 2012, 5:13 pm |
|
Calculating FTECalculating FTEsposted by Tom Hurst on Oct 26, 2012, 4:41 pm
I've reviewed several reference guides and I've just gotten myself more confused regarding calculating... Last reply: Susan Walter, Nov 1, 2012, 5:05 pm |