Calculating Daylight via the Prescriptive Method

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Dan Bielenin on Nov 5, 2012, 11:14 am

I am currently looking to utilize the prescriptive method in order to calculate the amount of daylight entering the regularly occupied spaces of a student housing complex. I have calculated the...

Last reply: Eddy Santosa, Nov 5, 2012, 12:26 pm

CxA Appointment

NC-2009 EAc3: Enhanced Commissioning
posted by Ameet AA on Oct 24, 2012, 11:46 am

Project type: School Academy

LEED Rating: New Construction 2009 for School, AGMBC 2010 Approach

Hi my company is providing LEED Assessment, Architectural as well as MEP consultancy...

Last reply: Peter Dishno, Nov 5, 2012, 12:09 pm

Accounting for Sun Shades in the Prescriptive Method

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Dan Bielenin on Nov 5, 2012, 11:18 am

When calculating the amount of daylight (via the prescriptive method) that enters through a south-facing window that utilizes sun shades, how does one account for the added shading benefit in...

Last reply: Jill Dalglish, PE, Nov 5, 2012, 12:05 pm

Server Room Submetering

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Patrick Culhane on Mar 7, 2012, 11:54 am

I'm inquiring in regards to server room spaces within an office building up for LEED...

Last reply: devin saylor, Nov 4, 2012, 10:40 am

I am very happy to see these

General forums
posted by Gang Chen on Nov 3, 2012, 9:24 pm

I am very happy to see these changes. They are long overdue.

LPD- SI vs IP

NC-2009 EAp2: Minimum Energy Performance
posted by Marcus Sheffer on Nov 1, 2012, 5:32 pm

My turn - a question for those of you who have the SI version of 90.1. Is the lighting power...

Last reply: Rudolph Carneiro, Nov 3, 2012, 5:50 pm

Historic Building Restoration

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Glen Boldt on Nov 1, 2012, 8:59 pm

The building is being restored to an "historic condition." Do unfortunate additions (like CMU block in sealed up former window areas) subsequent to the "historic condition" need to be included...

Last reply: April Brown, Nov 3, 2012, 5:25 pm

Temporary parking and access

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Nicolas MOLLE on Sep 20, 2012, 11:58 am

Hello,
In my project we are in case 1 greenfields Sites.
But we need to have temporary parking and access outside the future building perimeter : can we earn this credit even if we...

Last reply: April Brown, Nov 3, 2012, 5:00 pm

Natural ventilation for 100% outside air?

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Heather Holdridge on Nov 1, 2012, 5:52 pm

...

Last reply: Dylan Connelly, Nov 2, 2012, 7:58 pm

Private terrace

CS-2009 SSc5.1: Site development - protect or restore habitat
posted by Marcio Alberto Casado Pereira on Sep 24, 2012, 2:42 pm

My C&S project has a terrace on the 1st floor (below there is only the parking garage). That terrace is only accessible by the Meeting Room, which is used by the building users. The meeting...

Last reply: Tristan Roberts, Nov 2, 2012, 1:37 pm