Topic | Recent |
---|---|
EAC2 in a Positive Energy BuildingNC-2009 EAc2: On-Site Renewable Energyposted by Milena Rafols Salvador on Nov 8, 2012, 1:02 pm
We are certifying a Positive Energy Building, that will produce 130% of its energy consumption with solar PV. Last reply: Marcus Sheffer, Nov 8, 2012, 2:15 pm |
|
ASHRAE 90.1 Add G table G3.1 baselineCS-2009 EAc1: Optimize Energy Performanceposted by charles bell on Nov 8, 2012, 12:15 pm
We have a building which is six stories. The first floor is retail, second thru fifth is office and sixth is residential. All are served from a virtual central plant. This does not fit exactly... Last reply: Marcus Sheffer, Nov 8, 2012, 2:10 pm |
|
Baseline Lighting Power densityNC-2009 EAp2: Minimum Energy Performanceposted by Zonda E. Team on Nov 7, 2012, 8:31 pm
Hi, Can you help with the following two issues: Last reply: Marcus Sheffer, Nov 8, 2012, 1:59 pm |
|
Fuel efficient car vs single occupancy and 2-person carpoolEBOM-2009 SSc4: Alternative Commuting Transportationposted by Andrea Marzullo on Jul 1, 2011, 2:18 pm
One commuter drove a Civic hybrid each day to work (10 trips under fuel-efficient car). Two of those days he carpooled (4 trips under 2 person carpool) and three of those days he rode by himself... Last reply: Elizabeth Crenshaw Hammitt , Nov 8, 2012, 1:52 pm |
|
Radon Potential MapsGeneral forumsposted by Trudy Y. Smith on Nov 7, 2012, 10:10 amNovember 8, 2012- 9:40 am Jeff, this is the right forum to encourage USGBC to move in this direction. You are commenting as part of the 5th public comment period for LEED v4. USGBC considers comments like... Last reply: Tristan Roberts, Nov 8, 2012, 9:40 am |
|
Occupied/Partially Occupied definition inquiryNC-2009 PIf3: Occupant and Usage Dataposted by Alfred Rosales on Nov 4, 2012, 8:43 pm
In the guidebook, the definition of Regularly occupied spaces are areas where workers are seated or standing as they work inside a building. I would like to inquire the following: Last reply: Alfred Rosales, Nov 8, 2012, 1:04 am |
|
Brewery Process Load- Baseline and Proposed Case Set-upNC-2009 EAp2: Minimum Energy Performanceposted by Xun Jia on Nov 7, 2012, 11:48 am
The brewery I am modeling has large percentage of energy consumption associated with the process load. From past posts I understand I need to write a thorough narrative explaining the standard... Last reply: Marcus Sheffer, Nov 7, 2012, 5:58 pm |
|
Pre Development & Post Development runoff rate & quantity zeroNC-2009 SSc6.1: Stormwater design - quantity controlposted by Heather Holdridge on Nov 6, 2012, 3:41 pm
We are working on a Core & Shell project on Cayman Islands and would like to pursue SS Credit 6.1 & 6.2. The project is on a previously developed site.There are deep wells existing on the... Last reply: Heather Holdridge, Nov 7, 2012, 5:44 pm |
|
Name Change in the ProjectLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Michelle Deschaaf on Oct 20, 2011, 3:56 pm
We have a project that we registered with one name and the client decided to change their company name when the project was complete. We are still in the process of filling out all the templates... Last reply: Maria Blake, Nov 7, 2012, 1:10 pm |
|
IEQp1NC-2009 IEQp1: Minimum indoor air quality performanceposted by susan eguia on Oct 29, 2012, 11:26 am
Hi, We've got the review comments from USGBC that says: "Please provide a separate ventilation rate procedure calculation for each multiple-zone recirculating system serving the... Last reply: Hernando Miranda, Nov 7, 2012, 12:34 pm |