Topic | Recent |
---|---|
Just in Time!General forumsposted by Marcus Sheffer on Nov 5, 2012, 4:29 pm
My date is in December and I have procrastinated doing anything. Sounds like I may be glad I waited. I would also put in a plug for waiving the CMP entirely for LEED Fellows! Last reply: Marcus Sheffer, Nov 12, 2012, 2:06 pm |
|
What Constitutes a Flooring System?Schools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systemsposted by Grace Heicher on May 26, 2011, 5:00 pm
This may seem like a simple question, but do recessed foot grilles or walk-off matts count as a flooring system? Last reply: Lauren Sparandara, Nov 12, 2012, 11:09 am |
|
Active ingredientEBOM-2009 IEQc3.6: Green cleaning - indoor integrated pest managementposted by Katherine Ann Resurreccion on Nov 6, 2012, 8:19 pm
Hi All, Our client uses pesticides/chemicals in their facility, some are those that are commercially available or sold for household use, however the active ingredient is not present on... Last reply: Megan Meiklejohn, Nov 12, 2012, 10:48 am |
|
Outdoor Air Intake: Baseline vs. ProposedNC-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Nov 12, 2012, 9:07 am
We are currently working on a LEED project whose Baseline Building will have an HVAC system 5 installed. Taking into account that section G3.1.1 of ASHRAE 91.1-2007 states that “for systems 5, 6... Last reply: Marcus Sheffer, Nov 12, 2012, 9:46 am |
|
TSS RETENTIONNC-2009 SSc6.2: Stormwater design - quality controlposted by Albert Sagrera on Nov 12, 2012, 5:57 am
Hello! Last reply: Albert Sagrera, Nov 12, 2012, 6:27 am |
|
LEED for Home Multi-FamilyPilot-Credits PC38: Advanced Utility Trackingposted by Nate Gapinski on Nov 9, 2012, 12:24 pm
Has anyone ever certified a multi-family construction project? Just wanted to see how the process was and if we are on top of everything. Last reply: Tristan Roberts, Nov 11, 2012, 2:02 pm |
|
Single Stream Waste / RecyclingEBOM-2009 MRc6: Solid waste management - waste stream auditposted by Terry Gorski on May 8, 2012, 3:39 pm
What would be the best way for a building to document their audit if they contract for single stream waste/recycling? The occupants do not sort anything – both waste and recycling go into single... Last reply: Barry Giles, Nov 11, 2012, 12:35 pm |
|
Group Certification FeesLEED Guidance for Campuses and Multiple Buildingsposted by Omer Moltay on Nov 5, 2012, 5:18 am
I can see that group certification (AGMBC Part II) is now available. However, a note on the USGBC website mentions: "Until functionality is available in LEED Online to certify group... Last reply: Sustainability Provider, Nov 11, 2012, 9:57 am |
|
LED Lamps in Luminaires Designed for Other LampsCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Elizabeth Eason on Aug 14, 2012, 3:53 pm
We have a project with 2 different pendant fixtures that the Owner really wants to use - but they are designed for MR-16 and incandescent lamps. It appears that, according to ASHRAE 90.1-... Last reply: Bill Swanson, Nov 9, 2012, 4:45 pm |
|
Accessibility for SeniorsPilot-Credits PC34: Design for Adaptabilityposted by Lance Hillegas on Nov 9, 2012, 4:09 pm
Our project is an age and income restricted apartment building for low income seniors. The Pennsylvania state program under which we designed the project already mandated adaptability for... |