Submit a Design Credit during Construction Application Review with a Split Submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Felicia Ridgeway on Mar 20, 2018, 2:29 pm

My project is a split submittal, with a Design Preliminary Application review and a Construction Application review. Credit SSc4.1 Alternative Transportation - Public Transportation, a Design...

Last reply: Renee Shirey, Mar 20, 2018, 3:19 pm

Campus submission for review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Philippa Cameron on Feb 26, 2018, 2:49 am

Hi. We have a campus Master Site that we believe is ready for design review submission. We have completed all forms for the targeted credits and added all documents to LEED online. Some of the...

Last reply: Michelle Reott, Mar 9, 2018, 2:35 pm

How to Model unit heater in Basel & Proposed model following 90.1-2010?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by soham babu on Mar 8, 2018, 8:38 am

In my Proposed model(Design) I have DOAS with gas heating, VRF Fan coil units & Electric Unit heaters. following ASHRAE-90.1-2010,

  • In Baseline for electric unit heater Shall I...

Last reply: Marcus Sheffer, Mar 8, 2018, 8:59 am

What is a CB and why can't I submit my project?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Leilanie Bruce on Jan 10, 2018, 6:21 pm

I went to submit my project today and received an error message stating "Your project has not been assigned a CB. You will receive an email notification when a CB has been assigned." What does...

Last reply: Michelle Reott, Jan 10, 2018, 6:51 pm

Which drawing set is required for LEED documentation?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Waleed AlGhamdi on Dec 4, 2017, 12:46 pm

Hello,

We've worked on a few LEED projects in the past, and we've always used the most recent drawings available to us. Sometimes it's 50% CDs, or 100% CDs, issued for construction, or...

Last reply: Michelle Reott, Dec 4, 2017, 4:32 pm

Sunset date and timelines

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by suveera kakkar on Nov 15, 2017, 4:21 am

Hello

I am working on a CS-2009 project with precertification and split review. As the sunset date is set for June30, 2021 we are trying to set timeline for the submissions. As per my...

Last reply: Michelle Reott, Nov 30, 2017, 2:08 pm

Is the USGBC website incredibly slow for you too?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Eesmyal Santos-Brault on Nov 21, 2017, 1:27 pm

With LEED V4, we are using the online credit library regularly.  Many of our staff are frustrated at how slow the lookup and retrieval is.  Maybe it's because we're in the desolated northern...

Last reply: emily reese, Nov 21, 2017, 3:43 pm

New credit at appeal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Kavita K on Nov 9, 2017, 3:16 pm

Hi LEEDusers,

Does LEED allow a project team to add new credits as appeal after the final construction review? This is for LEED 2009 NC.

Campus project upload (no upload tab)

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Philippa Cameron on Oct 29, 2017, 1:17 am

Hi everyone. It is my first time uploading information using a Campus Master Site on LEED online. Campus credit information has been uploaded under the Master Site but is not yet submitted for...

Last reply: Philippa Cameron, Oct 29, 2017, 10:33 am

Change the Location/Alter Something After Standard Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Ian Oliver on Aug 21, 2017, 8:33 pm

Can we still alter the location or renovate something after the standard review (for example: relocation of bike racks)?
I'am confused because...

Last reply: Ian Oliver, Aug 22, 2017, 3:56 am