Log in
Forum » LEED Rating System Selection
Topic

LEED ID+C: Commercial Interior or LEED BD+C: New Construction

LEED Rating System Selection
posted by ARDOR GREEN on May 31, 2018, 6:46 am

Dear all,

There is a project having 4 stories with 8 equal areas, three of them are going to be registered for LEED. They include a R&D room (1), a manufacturing area (2) and a storage...

Last reply: ARDOR GREEN, Jul 11, 2018, 3:46 am

Which Rating System Applies to a small Addition to In-Patient Hospital?

LEED Rating System Selection
posted by Margaret Montgomery on Jul 5, 2018, 6:41 pm

We're beginning a project that includes a 7500 sf ED addition to an existing Emergency Department that will undergo remodeling. The project is part of a recently constructed but not LEED...

LEED ID+C: TIME, BOUNDARY AND OWNER

LEED Rating System Selection
posted by ARDOR GREEN on Jun 26, 2018, 3:01 am

Dear all,

A building with 8 rooms that have similar areas of 3,825 sqm is under construction phase. Its owner wants to get LEED ID+C certification for R&D room.

Question...

Warehouse project failed LEED BD+C certification wants to try again

LEED Rating System Selection
posted by Amine Zeidane on Jun 13, 2018, 8:18 am

Hello,

A Warehouse project failed LEED BD + C certification in 2011 and wants to try again in 2018 with the same Building and for minimum cost.

What are options available ?

...

Last reply: Paula Melton, Jun 20, 2018, 11:33 am

Religious building which contains school, worship space kitchen and events spaces

LEED Rating System Selection
posted by Pamela Smith on Jun 13, 2018, 8:34 pm

Can this be under general...

Last reply: Pamela Smith , Jun 13, 2018, 9:02 pm

CLOSED-CELL SPRAY POLYURETHANE FOAM INSULATION

LEED Rating System Selection
posted by ALEX ROSE on May 31, 2018, 4:55 pm

GREETINGS!  Does anyone know of a study that demonstrates dangers (or not) of off-gassing of closed-cell spray polyurethane foam insulation after it's been installed for awhile?  Or, is it...

Campusapproach

LEED Rating System Selection
posted by Janine van den Kerkhof on May 18, 2018, 6:50 am

Hello all, 

I'm participating in a LEED Project which contains a mastersite and two projects (registration v2009 already took place for all). Several credits of the mastersite (campus)...

Last reply: Calie Gihl, May 31, 2018, 1:32 am

rating system selection

LEED Rating System Selection
posted by SANDRO PAGLIA on May 16, 2018, 10:12 am

Good afternoon, we're certifying a building that is 10% retail, 10% offices and 80% residential. We are unsure as to which rating system to choose, since the residential layout has not been...

Last reply: SANDRO PAGLIA, May 16, 2018, 4:03 pm

Shared parking in campus

LEED Rating System Selection
posted by Ricardo Sá on Apr 30, 2018, 7:33 am

One of our clients is starting a major refurbishment of an office building, located in the same campus of a large retail building (that will not be subjected to any intervention ) and intends to...

Last reply: Cynthia Kaplan, Apr 30, 2018, 9:21 am

Commercial office refurbishment: which rating system?

LEED Rating System Selection
posted by Ricardo Sá on Apr 26, 2018, 8:23 pm

One of our clients is starting a major refurbishment of an office building. Main characteristics of this operation are:

  1. Building Owner: the client itself;
  2. Building...