Example of DAYLIGHT AND Views

NC-2009 IEQc8.1: Daylight and views - daylight
posted by bojana kovacevic on May 20, 2016, 4:31 am

I am biginner in LEED, for the first time I am meeting with some things. I met first difficulty in Credit 8.2 Daylight and Views...If someone have to give me pdf of the concrete project with...

Last reply: TODD REED, May 24, 2016, 9:22 am

margin

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Francesco Passerini on May 12, 2016, 4:37 am

In DesignBuilder for the daylight simulation you have to impose a value for the parameter "margin", which is defined in the following way:
Enter the margin (in m or ft) around the zone...

Last reply: bojana kovacevic, May 23, 2016, 9:55 am

REVIT 2016 Daylight Analysis Tool not acceptable?

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Deborah Lucking on Apr 20, 2016, 5:36 pm

We submitted for this credit using the results from the REVIT 2016 daylight analysis tool. Both the Lighting Analysis plans and the Room Schedule Threshold results were submitted as part of the...

Last reply: TODD REED, Apr 21, 2016, 8:39 am

Simulation. Warehouse. Fixed high racks, occupied.

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Candice Clark on Mar 31, 2016, 3:29 pm

For a warehouse, can I deduct the permanently fixed high racking coverage area from the...

Last reply: TODD REED, Mar 31, 2016, 3:41 pm

Library stacks

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Andrew Hruby on Mar 26, 2016, 6:26 pm

First off I have a slight confusion about whether library stacks should be considered non regularly occupied area or a regularly occupied area with movable furniture.

If the stacks are...

Last reply: TODD REED, Mar 31, 2016, 1:18 pm

Prescriptive Method of Documenting- Floor Area (per bay)

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Michael Haugh on Mar 10, 2016, 6:28 pm

First off, I have had a very hard time finding information to help complete this Credit's documentation. There are terms that are undefined or have one meaning in regards to this Credit but other...

Last reply: TODD REED, Mar 14, 2016, 2:09 pm

Option B for a reception area in a massive office tower lobby

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Elliot Young on Feb 19, 2016, 6:00 pm

So, back again to ask another one. We are ever so close to reaching 75% threshold and without having the engineers run daylight models or measure the space I'm trying to pick up any space we can...

Last reply: TODD REED, Feb 24, 2016, 8:40 am

Light in open 3 story mezzanines

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Elliot Young on Feb 3, 2016, 10:50 am

We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.

The lowest level butts up to the 3...

Last reply: Elliot Young, Feb 19, 2016, 5:37 pm

Dark underground ballroom and regularly occupied space exception

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Olivier Brouard on Jan 22, 2016, 8:57 pm

Hi everyone,

Working on a conference center, we are close to get to Gold Certification by 2 points. Our chance to get closer to it is to get 1 pt for Daylight, and most probably another...

Last reply: Olivier Brouard, Jan 29, 2016, 8:39 pm

Combined approach

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Claire DeCamp on Dec 10, 2015, 5:49 pm

We have a project that is going to use a combined approach due to overhangs and the prescriptive calcs not providing enough SF. I have casually measured the spaces and we exceed 20fc. We have...

Last reply: TODD REED, Dec 11, 2015, 7:56 am