Forum » NC-2009 IEQc3.2
Topic

Number of air testing samples

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Qian Tang on Jan 3, 2017, 10:59 am

Our project office building has 22 floors and is divided in 4 portions – north wing, south wing, east wing and west wing. The total area of each wing (from ground floor to 22nd floor) is about 40...

Last reply: James Wilson, Jan 18, 2017, 2:04 pm

Filtration Change Prior to Flush-out

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Marcia Weekes on Sep 27, 2016, 8:17 am

On one project, the...

Last reply: Tristan Roberts, Jan 18, 2017, 12:10 am

Questions.

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by ethen mcmanus on Dec 15, 2016, 4:38 am

Listed below is my list of questions:

A) We have several FRESH air handling units and REGULAR air handling units on the roof of our building. Fresh Air handling units provide 100% Fresh...

Last reply: James Wilson, Jan 10, 2017, 4:04 pm

Option 2 Meaning of "Contiguous Area"

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Daniel Smith on Oct 28, 2016, 10:33 pm

Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each...

Last reply: Tom Nichols, Oct 31, 2016, 10:10 am

Combine options

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Leandro Silva on Jul 11, 2016, 5:08 pm

We are certifying a Project and we are preparing the documentation for the EQ credit 3.2 Construction Indoor Air Quality Management Plan – Before Occupancy.
This building is a 3 floor, LEED...

Last reply: David Hubka, Sep 1, 2016, 9:54 am

IAQ Testing path option 2

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Nanechka Pagan on Jun 8, 2016, 12:45 pm

Hi

During construction preliminary review our team received a technical advice that states the following:
" it does not appear was performed for each area of the building served by a...

Last reply: David Hubka, Jul 11, 2016, 5:35 pm

Maximum Temperature

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Omar ElRawy on May 8, 2016, 8:07 am

Dear All,
I need to ensure that in the 60/60 rule, I do not find anything about the maximum indoor temperature during flush-out, please advice if I can maintain any indoor temperature as...

Last reply: David Hubka, May 12, 2016, 8:21 am

Purpose behind the 60% RH parameter?

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Landry Watson on Feb 25, 2016, 5:08 pm

The reference guide is clear that 14,000 CFM of OA per SF (that is >60deg and

Last reply: Lyle Axelarris, May 4, 2016, 7:56 pm

Path 2 Flushout

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Amy Harmon on Nov 3, 2015, 2:33 pm

Our project went with Path 2 Post-occupancy flush out. All AHUs required 2-4 days of flush out before occupancy could occur and about 24 days post occupancy. As we are reviewing the results, we...

Last reply: Landry Watson, May 4, 2016, 6:08 pm

Option 1 Path 2 Temperature and Humidty Requirements

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Amy Harmon on Apr 18, 2016, 5:20 pm

Path 1 indicates flush-out needs to be accomplished with 14,000 cu ft. of OA per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and no more than 60% RH....

Last reply: David Hubka, Apr 22, 2016, 10:07 am