Enhance Cx, 10 month review of building operation

NC-2009 EAc3: Enhanced Commissioning
posted by Laura Howe on Mar 29, 2016, 3:32 pm

Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?

Last reply: Scott Bowman, Mar 31, 2016, 9:36 pm

Timing of systems manuals

NC-2009 EAc3: Enhanced Commissioning
posted by Melinda Shah on Mar 13, 2014, 3:10 pm

The LEED NC multiple building project we are working on has been occupied for 6-18 months (depending on the building) and we have everything ready to submit everything for the construction review...

Last reply: Joyce Kelly, Dec 9, 2015, 2:18 pm

AV systems?

NC-2009 EAc3: Enhanced Commissioning
posted by Erin Holdenried on Dec 4, 2015, 2:19 pm

Do AV systems need to be commissioned for LEED. Such as, if they lighting were connected to the AV system?

Last reply: Scott Bowman, Dec 4, 2015, 4:02 pm

Commissioning Starting After 50% CDs

NC-2009 EAc3: Enhanced Commissioning
posted by Sara Zoumbaris on Nov 2, 2015, 4:37 pm

Scott Bowman LEED Fellow Integrated Design + Energy Advisors, LLC LEEDuser Expert 517 thumbs up November 2, 2015- 5:03 pm I do not think there has ever been a LI on this, but it has been discussed several times in this forum, that is for sure. First of all, this is an area where I tread lightly with owner expectations. Sell all the reasons that Enhanced Cx is a great thing to do, then say that if done correctly, you might get a point out of it. I have been involved in a couple projects that had Enhanced start after the 50% point, and one that happened after the contract was awarded. In all cases,...

Last reply: Scott Bowman, Nov 2, 2015, 5:03 pm

Green Building Consultant as CXA

NC-2009 EAc3: Enhanced Commissioning
posted by SAMY Chamy on Sep 8, 2015, 7:30 am

Our project cover 135000 Sq.ft factory we get MEP design from MEP Consultant through Contractor.

We appoint green building consultant as a...

Last reply: Scott Bowman, Sep 20, 2015, 10:36 am

Separate CxA's for Fundamental and Enhanced Cx?

NC-2009 EAc3: Enhanced Commissioning
posted by Timothy Casper on Oct 24, 2014, 9:17 am

In a traditional design-bid-build project, does the...

Last reply: Scott Bowman, Aug 6, 2015, 12:06 pm

Commissioning DES if waste heat is recovered from process

NC-2009 EAc3: Enhanced Commissioning
posted by Dave Hubka on May 26, 2015, 1:39 pm

Our project includes an existing (more than three years old)...

Last reply: Dave Hubka, May 26, 2015, 5:40 pm

Eligible CxA for Design&Built project

NC-2009 EAc3: Enhanced Commissioning
posted by Panupant Phapant on Mar 16, 2015, 10:56 am

Hi
We are working on the project that the owner performs both design and construction activities. Can the an employee of the owner who does not participate in design and construction teams...

Last reply: Panupant Phapant, Mar 21, 2015, 9:27 pm

Contract between owner and CxA

NC-2009 EAc3: Enhanced Commissioning
posted by Gina Dederer on Oct 6, 2014, 5:24 am

We recently had this credit denied based on the fact that our contract did not explicitly state that the 10 month follow-up review is included in the activities of EAc3, even though we provided a...

Last reply: Scott Bowman, Oct 25, 2014, 10:44 pm

Commissioning of renewable energy systems

NC-2009 EAc3: Enhanced Commissioning
posted by Peg Manuel on Oct 22, 2014, 12:50 pm

EAc3 requires the individual serving as the...

Last reply: Scott Bowman, Oct 25, 2014, 10:37 pm