Log in
Forum » NC-2009 EAc1
Loading...
Topic

Orientation for existing building energy simulation

NC-2009 EAc1: Optimize Energy Performance
posted by Mark JIN on Aug 1, 2017, 6:12 am

Hello,

I'm doing a factory project in Bangkok now. A new production building will be built adjacent to an existing production building. And renovation work will also be conducted on the...

Last reply: Marcus Sheffer, Aug 1, 2017, 11:28 am

EAc1 Space Cooling and Heating

NC-2009 EAc1: Optimize Energy Performance
posted by Mark Rawson on Jul 6, 2017, 7:27 pm

on their forum by email (hap-users@lists.onebuilding.org). Good luck Log in or register to post comments ...

Last reply: Khaled Fouda, Jul 7, 2017, 10:12 am

ASHRAE 90.1-2015 to 2007 equivalency table

NC-2009 EAc1: Optimize Energy Performance
posted by Luis Huertas on May 18, 2017, 1:31 pm

We are working on a project that is using ASHRAE 90.1-2015 version and we are looking for a table listing the equivalency of points similar to the one done for the 2010 version? Any resources...

Last reply: Billy Condor, Jun 16, 2017, 5:23 pm

DES with CHP, electric and absorption chillers and boilers

NC-2009 EAc1: Optimize Energy Performance
posted by Ricardo Sá on May 16, 2017, 10:51 am

A building pursuing LEED 2009 NC certification will be located in a campus with a District Energy System (...

Last reply: Marcus Sheffer, May 26, 2017, 11:22 am

Baseline System 2

NC-2009 EAc1: Optimize Energy Performance
posted by Nikhil Kumar on Apr 16, 2017, 2:02 am

As per Table 6.8.1D, I observed the following
EER = 12.3-(0.213*Cap/1000) EER
Also, Cap means the rated cooling capacity of the product in...

Last reply: Marcus Sheffer, Apr 21, 2017, 10:48 am

ASHRAE 90.1-2007 article G3.1.1 exception (a)

NC-2009 EAc1: Optimize Energy Performance
posted by Ann-Judith Belanger on Mar 24, 2017, 8:53 am

Hi everyone, I have a question regarding the reference's HVAC heating energy source for my projet. Here's the general outline:
My project consist of an office building with 3 above-grade...

Last reply: Ann-Judith Belanger, Mar 27, 2017, 8:59 am

Leed 2009 NC-District cooling path one

NC-2009 EAc1: Optimize Energy Performance
posted by Mark JIN on Mar 20, 2017, 10:53 pm

Dear Friends,

I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water. However the DCP supplier is not willing to share any...

Last reply: Marcus Sheffer, Mar 24, 2017, 9:48 am

Energy modeling for an industrial facility

NC-2009 EAc1: Optimize Energy Performance
posted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:33 am

I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the...

Last reply: Marcus Sheffer, Mar 20, 2017, 10:03 am

Energy modeling for an industrial facility

NC-2009 EAc1: Optimize Energy Performance
posted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:36 am

I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the...

Energy modeling for an industrial facility

NC-2009 EAc1: Optimize Energy Performance
posted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:35 am

I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the...