Forum » NC-2009 WEc2
Topic

water treatment outside LEED project boundary

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Adi Negara, LEED AP BD+C on May 20, 2013, 12:56 am

Dear all,

We have a small LEED project (an office space with landscape) which located inside non-LEED construction project (factory), which will be conducted simultaneously. My question is...

Last reply: Adi Negara, LEED AP BD+C, Nov 14, 2013, 8:45 am

can we get credit for a future cistern?

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Saju Varghese on Aug 19, 2013, 1:59 pm

If we have prepared piping but cistern is not installed yet and it will possibly be installed in the future, can we get credit for it?

Last reply: Tristan Roberts, Nov 4, 2013, 4:55 pm

0.8 gpf water closets, no urinals

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Sam Farmer on Oct 9, 2013, 3:36 pm

We have a project that is considering a 0.8 gpf water closet. The project is an existing building renovation and we do not have ADA clearance space for the addition of urinals. Since the...

Last reply: Tristan Roberts, Nov 3, 2013, 1:40 pm

Combined approach to WEc2

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Michael Wironen on Mar 19, 2013, 11:57 am

We have a project where, through efficient fixtures, we will reduce wastewater (WCs, lavatories, and showers) conveyance by approximately 45%. This represents a significant reduction in potable...

Last reply: Devani PERERA, Oct 16, 2013, 11:38 am

Use of rainwater collected offsite

NC-2009 WEc2: Innovative Wastewater Technologies
posted by John Covello on Aug 2, 2013, 2:10 am

Our project is considering creating a retention pond for rainwater on land adjacent to the LEED project. They may develop the land where the pond is located so it cannot be included in the...

Last reply: Amy Rider, Sep 25, 2013, 1:31 am

Rainwater collection and reuse on campus

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Maya Karkour on Apr 18, 2013, 5:08 am

Hello,

Our project is a new building on a school campus. The Engineers are proposing collecting rainwater from the building's roof, storing this is a big common water tank next to the...

Last reply: Michael DeVuono, Apr 18, 2013, 9:14 am

One single treatment plant for two LEED projects

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Michael E. Edmonds-Bauer on Mar 6, 2013, 1:15 pm

We have a project in which site two independent buildings will apply for LEED certification.

In this case, (when the treatment plant is shared by the two LEED buildings), is there any...

Last reply: Michael E. Edmonds-Bauer, Mar 22, 2013, 2:33 am

groundwell non potable saline water

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Natalie Tan on Mar 2, 2013, 1:49 pm

We are trying to pursue this credit, by using municipal 'brackish' water for irrigation and toilet flushing. The source of the municipal brackish water is groundwater pumped up from wells that is...

Last reply: Tristan Roberts, Mar 6, 2013, 2:35 pm

Rainwater Harvesting Calculator

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Erin Holdenried on Feb 18, 2013, 5:32 pm

Does anybody know of a good...

Should I consider process water?

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Nadia Ayala on Mar 22, 2012, 2:19 pm

Hi,
My project is a pharmaceutical facility. For their industrial process, they use a fairly large amount of water. I was wondering if process water is considered for this credit.

...

Last reply: Tristan Roberts, Feb 7, 2013, 5:42 pm