Appealing period.

NC-2009 PIf4: Schedule and Overview Documents
posted by Jatuwat Varodompun on Jan 9, 2013, 10:36 am

Does the announced holidays of...

Last reply: David Posada, Jan 14, 2013, 1:18 pm

Mechanical Plans still under design

NC-2009 PIf4: Schedule and Overview Documents
posted by Gaston Viau on Jan 4, 2013, 11:29 pm

We haven't finished yet the design of the mechanical system, so the mechanical plans that we have are just a current aproximation.

Is it mandatory to upload the mechanical drawings during...

Last reply: David Posada, Jan 14, 2013, 1:14 pm

Representative floorplans

NC-2009 PIf4: Schedule and Overview Documents
posted by Michael E. Edmonds-Bauer on Dec 12, 2012, 1:43 pm

I was considering sending every floor plan that has something different in order to comply with "representative floorplans", but I double thought about it and considered it would be a bit too...

Last reply: Michael E. Edmonds-Bauer, Jan 2, 2013, 12:46 pm

Project without any HVAC change

NC-2009 PIf4: Schedule and Overview Documents
posted by Diana Hill on Dec 22, 2012, 7:34 pm

We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system. Do we still have to provide the mechanical schedule/plan...

Last reply: Kimberly Frith, Dec 31, 2012, 9:10 am

Appealing process

NC-2009 PIf4: Schedule and Overview Documents
posted by Jatuwat Varodompun on Dec 18, 2012, 12:17 pm

I am about to appeal for my project.

if some of the credits are denied again, can we try to correct the report or modify the building to comply with the requirment and appeal again? (the...

Last reply: David Posada, Dec 18, 2012, 3:02 pm

P1 Form 4 Core and Shell Scope Upload L-6

NC-2009 PIf4: Schedule and Overview Documents
posted by Phil Meyer on Dec 6, 2012, 4:22 pm

I have a question regarding appropriate document types for Upload L-6. The developer intends to achieve LEED credits for the building based on tenant cooperation/compliance. However, they do...

Last reply: David Posada, Dec 17, 2012, 2:28 pm

P1 form 4: Date team expects to make first LEED submittal

NC-2009 PIf4: Schedule and Overview Documents
posted by John Eden on Nov 29, 2012, 2:50 pm

If we are doing split review should this date be for the Design Review?

Last reply: David Posada, Dec 3, 2012, 3:29 pm

LEED lease

NC-2009 PIf4: Schedule and Overview Documents
posted by Sustentator Argentina on Oct 29, 2012, 3:34 pm

Does someone know what I'm supposed to upload in the point that says Lease Associated with LEED? Thanks! Romina

Last reply: Kimberly Frith, Nov 26, 2012, 9:33 am