Log in
Forum » EBOM-v4 EAp2
Loading...
Topic

Compliance paths for estar eligible buildings with scores <75

EBOM-v4 EAp2: Minimum Energy Performance
posted by Alexa Stone on Jul 21, 2014, 1:52 pm

We have a building that is an ENERGY STAR-eligible building type but has a score that is less than 75 and unable to achieve 75. Using Case 1 it would not qualify. However, the building is able to...

Last reply: Edward Malesevich, Sep 16, 2015, 11:07 am

Case 2, Option 2 clarification- years

EBOM-v4 EAp2: Minimum Energy Performance
posted by Alexa Stone on Jul 21, 2014, 1:56 pm

The reference guide refers to comparing site energy data for the previous 12 months with data from the 3 contiguous yrs of previous 5 yrs (in order to demo 25% improvement). Does 3 of the last 5...

Last reply: Edward Malesevich, Sep 16, 2015, 10:56 am

Professional Engineer

EBOM-v4 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Jul 30, 2015, 8:30 am

To comply with the prerequisite is it essential to engage a Professional Engineer if the project is located outside the U.S. and consequently ineligible for Energy Star certification?

Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Aug 12, 2015, 12:27 pm

Shared building electricity meter

EBOM-v4 EAp2: Minimum Energy Performance
posted by LEED Pro Consultant on Jan 5, 2015, 2:53 pm

We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in...

Last reply: LEED Pro Consultant, Jul 2, 2015, 4:39 pm

The year of metering

EBOM-v4 EAp2: Minimum Energy Performance
posted by Vindio Corro on Nov 20, 2014, 10:40 am

Must be the year of metering after the registration of the project or can be used a year of metering of before?

Last reply: Edward Malesevich, Jan 5, 2015, 2:59 pm