Public Roofgarden- Entryway systems

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Christoph Keck on Mar 23, 2022, 8:42 am

Hi guys,

the project will have a public rooftop access. Does this qualify as a regularly used extior entrance which would require some sort of dirt-capturing entryway system?

I...

Last reply: Christoph Keck, Mar 24, 2022, 4:53 am

Entryway Systems

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Lara Ibarra on Sep 15, 2020, 3:41 pm

Hi everyone,

For the entryway systems, the guide doesn't specify if it has to be installed inside and/or outside the building's entrance. Does anyone know if it can be installed 5 feet...

Last reply: Cindy Davis, Mar 23, 2022, 2:23 pm

Low use printing rooms exempted from needing self-closing doors

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Alain Brierley on Jul 12, 2017, 11:48 am

Does LEED v4 allow exemptions for printing rooms from needing self closing doors based on low user printer use data similar to USGBC's LEED-CI ruling 12-12-2005? Thanks.

Last reply: Paula Hernandez, Mar 7, 2022, 11:10 am

chemical storage cabinet

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Erik Heuler on Feb 16, 2022, 5:17 pm

Hello,

I'm working on a project that includes a warehouse area.  The client wants to provide chemical storage cabinets, in lieu of a room.  Does anyone know if these satisfy the credit...

Roll out mats specifications?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Victoria Rios Esteve on Nov 3, 2021, 1:13 pm

Hi everyone! On our project, we are placing rollout mats on the exterior but under roof hanging. Do you have any suggestion on brand/model/type we can get to achieve this credit? Any...

Last reply: Afogreen Build, Dec 21, 2021, 6:04 pm

V4 Entrance mats/roll-up mats

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Kathryn Haeberle on Jul 5, 2021, 1:49 pm

Hi, does anyone know if the v2009 interpretation still applies that the first 3 ft of the 10 ft must be a permanent system (like recessed mat system) and the remainder can be roll-up mats.  Or...

Last reply: Maria Porter, Aug 11, 2021, 5:19 am

CO2 Sensors for Open Areas

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Jon Silhol on Jul 30, 2021, 11:34 am

What is the requirement for spacing of CO2 sensors in large open areas that are classified as high...

Last reply: Jonathan Weiss, Aug 10, 2021, 4:40 pm

ERVs and EQc1

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Andrew Shaw on Jul 27, 2021, 3:26 pm

Hello all,

I work for a ventilation manufacturer who creates ERV's/HRV's. Our units have been used to qualify for prereq's and points for energy and atmosphere. However, what we really...

Last reply: Afogreen Build, Aug 8, 2021, 7:40 pm

Fan Powered Terminal Unit MERV-13 Filtration

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Leslie Paras on Dec 2, 2020, 2:24 pm

Is the recirculated air delivered by a Fan Powered Terminal Unit required to be filtered by a...

Last reply: Karen Joslin, Jul 23, 2021, 12:48 pm

Entryway System

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Summer Gorder on Oct 9, 2020, 9:21 pm

Does the 10'-0" entrway requirement only apply to the main entry or all entries to the building?

Last reply: Maria Porter, Jun 4, 2021, 3:51 am