Topic

Change to Cx agent

NC-v4 EAp1: Fundamental commissioning and verification
posted by Cindy Quinn on Aug 29, 2017, 7:08 pm

I'm working on a v4 project currently in CD design phase. It appears that the Owner may be required to change their Commissioning Agent due to a contractual issue out of the control of the Design...

Last reply: Scott Bowman, Sep 13, 2017, 9:13 pm

LEED v4 CxA

NC-v4 EAp1: Fundamental commissioning and verification
posted by Michel Labrie on Aug 1, 2017, 6:44 pm

In LEED v4, the...

Last reply: Scott Bowman, Aug 5, 2017, 12:25 pm

Envelope CxA Requirements

NC-v4 EAp1: Fundamental commissioning and verification
posted by Risto Beatty on Apr 19, 2017, 8:58 am

Do the rules for who can be a...

Last reply: Scott Bowman, Apr 21, 2017, 12:29 pm

District Energy Cx Guidance

NC-v4 EAp1: Fundamental commissioning and verification
posted by Candice Rogers on Feb 22, 2017, 10:05 am

Hello,
We have a project that meets the requirements of District Energy Systems. There is one new piece of equipment and multiple existing that will serve the facility. In thinking...

Last reply: Candice Rogers, Feb 22, 2017, 1:08 pm

Data Center CxA

NC-v4 EAp1: Fundamental commissioning and verification
posted by Peter Dishno on Feb 10, 2017, 3:57 pm

The LEED V4 book has the comment:

"DATA CENTERS ONLY
For small projects with computer room peak cooling loads less than 2,000,000...

Last reply: Scott Bowman, Feb 19, 2017, 5:24 pm

Cx plan

NC-v4 EAp1: Fundamental commissioning and verification
posted by Joshua Roy on Feb 8, 2017, 4:56 pm

Does anyone have an example...

Last reply: Scott Bowman, Feb 17, 2017, 1:23 pm

Plumbing Commissioning Scope Of Work

NC-v4 EAp1: Fundamental commissioning and verification
posted by Dan Forino PE, CCP, LEED AP BD+C, WELL AP on Mar 3, 2014, 1:38 pm

In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls. Is this saying all plumbing pumps (sewage ejector, domestic water booster, etc) are required or only...

Last reply: Gabriela Crespo, Oct 21, 2016, 1:50 pm

Authority having Jurisdiction

NC-v4 EAp1: Fundamental commissioning and verification
posted by Pam Lynch on Sep 14, 2016, 9:35 pm

I just took a LEED GA pratice exam and do not understand the answer to this question: The ‘Authority having Jurisdiction’ is responsible for which of the following?

a) Completing the...

Last reply: Scott Bowman, Oct 4, 2016, 5:28 pm

M&V credit energy model calibration

NC-v4 EAp1: Fundamental commissioning and verification
posted by MKK LEED on Nov 23, 2015, 2:15 pm

With the removal of the M&V credit under LEED V4.0, is a calibrated energy model still required under Fundamental Commissioning and Verification credit or some other LEED credit?

Last reply: Scott Bowman, Dec 4, 2015, 1:14 pm

Commissioning Authority's LEED experience

NC-v4 EAp1: Fundamental commissioning and verification
posted by Maria Camacho on Oct 28, 2015, 8:17 am

At the Fundamental Commisioning and Verification Prerequisite it says that the...

Last reply: Scott Bowman, Nov 2, 2015, 12:27 pm