posted by Stacey Olson on Sep 18, 2018, 9:50 pm

It appears under LEEDv4.1 O+M, this credit was removed.

We have a site that is 19.1 acres, which equates to a cost of $332,798.40 at $0.40 / sf - a substantial cost for 1 point.

The...

Preserved for the life of the building?

NC-v4 SSc2: Site development - protect or restore habitat
posted by Erin Holdenried on Sep 11, 2018, 6:56 pm

Does restored area have to be preserved for the life of the building, as v2009?  It appears this is no longer a requirements in v4. Can any one confirm?

Green Roof Characteristics and Depth

NC-v4 SSc2: Site development - protect or restore habitat
posted by Cathal Heneghan on Aug 20, 2018, 5:37 am

Hi all

I am working on an existing building where the LEED boundary is the building footprint.

We want to achieve this credit via the installation of a green roof of 30% of the site...

Last reply: Trista Little, Sep 7, 2018, 8:12 pm

Certifying a new airport terminal using LEED- exclude the runways?

NC-v4 SSc2: Site development - protect or restore habitat
posted by Ricardo Sá on Aug 29, 2018, 4:24 am

Dear...

Is previously agricultural used area considered disturbed?

NC-v4 SSc2: Site development - protect or restore habitat
posted by Torokaisnen Eetu on Aug 27, 2018, 3:07 am

Hi everyone.

We are working on a project where the site was originally used for agriculture. The site has been graded to create an even surface for industrial use (the land is located on...

Last reply: Martha Norbeck, Aug 27, 2018, 4:36 pm

Option 2- Conservation Organization

NC-v4 SSc2: Site development - protect or restore habitat
posted by Luis Huertas on Jul 20, 2017, 4:40 pm

The credit option 2 calls for a...

Last reply: Laura Matute, Jul 8, 2018, 4:12 pm

Example specifications?

NC-v4 SSc2: Site development - protect or restore habitat
posted by emily reese moody on Jul 3, 2018, 2:15 pm

Does anyone have an example specification of section SOIL PREPARATION 329113 that they have completed for a project? We're trying to make sure we include all the proper requirements for an...

Last reply: emily reese moody, Jul 6, 2018, 7:03 pm

LEED Interpretation 10231 still valid for v4?

NC-v4 SSc2: Site development - protect or restore habitat
posted by CT G on May 24, 2018, 12:45 pm

...

Last reply: Trista Little, May 29, 2018, 1:26 pm

Greenfield

NC-v4 SSc2: Site development - protect or restore habitat
posted by Lene Hill on Mar 9, 2018, 4:30 pm

The site is about 47 acres of woods and meadow. It was at one time part of an estate and had a home, garden etc on it.  This is where the new site is going.   We can easily protect 40% of the...

Last reply: Lene Hill, Mar 12, 2018, 2:14 pm

Preserve and protect from all development and construction activity 40% of the greenfield area on the site

NC-v4 SSc2: Site development - protect or restore habitat
posted by Jason Garvens on Jan 30, 2018, 12:44 pm

I'm hoping someone can make this requirement interpretation crystal clear for me as I'm struggling to fully grasp what it mean. Assume all project space was initially...