Log in
Forum » United States
Topic

Confirmation of Agent's Authority

LEED v4.1 Discussion Forum
posted by Aaron Kennedy on Nov 24, 2020, 11:00 am

We are filling out the Confirmation of Agent's Authority.  Does the agent need to be the LEED Accredited Professional or can it be me, the lowly non LEED certified person?  

Thank you,...

Last reply: emily reese moody, Jan 4, 2021, 3:57 pm

Garden Sizing?

Pilot-Credits SSpc82: Local food production
posted by Ty Champion on Jan 4, 2021, 10:02 am

Good morning all,

For a schools project, does LEED stop ccounting garden area after the maximum 1500 SF?

Thanks,

Ty

Pilot Credit 87- Verified Construction and Demolition Rates

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Patricia Lloyd on Feb 12, 2018, 1:22 pm

Documentation of this credit was easy because we are using a hauler who has a CORR certified facility that is near to our job.  We tried this pilot credit once before and did not achieve it...

Last reply: Kavita, Dec 29, 2020, 11:19 pm

Wall Components v2- sheathing edition...

NC-v4 EQc2: Low emitting materials
posted by Tom Gibbons on Dec 16, 2020, 7:15 pm

Hi folks: posted this to an older conversation but thought a new question might get it more looks. 

Currently reviewing a gypsum sheathing product that is inside the moisture barrier of a...

Last reply: David Posada, Dec 23, 2020, 5:42 pm

FTE for a rarely occupied space

Calculating FTEs
posted by Chloe Naese on Dec 22, 2020, 3:58 pm

Hi everyone,

We have a conference space in a bank that would be unoccupied about 90% of the time. The rest of the time, it would be used for public gatherings and meetings. How should we...

Last reply: David Posada, Dec 23, 2020, 4:29 pm

Can lab surfaces be excluded?

CI-v4 EQc6: Interior lighting
posted by Kristen Magnuson on Mar 6, 2017, 1:19 pm

I'm working on a lab TI. The project's work surfaces include both lab tables and typical office-style workstations. We'd like to meet the surface reflectance values for work surfaces &...

Last reply: Jonathan Weiss, Dec 23, 2020, 4:15 pm

Number of Floors in Project Space, or Building?

Pilot-Credits EQpc117: Quality views in nonregularly occupied spaces
posted by Hrisa Gatzoulis on Dec 23, 2020, 2:38 pm

The percentage floor area required to have quality views is dependent on the number of floors in the building.  For a CI project, do we count only the number of floors associated with the project...

Last reply: Christopher Hoeh, Dec 23, 2020, 2:53 pm

IDc1.3: Safety First: Cleaning and Disinfecting Your Space

Working through COVID-19
posted by Carlos Sanchez on Dec 11, 2020, 1:53 am

I am struggling with finding the green cleaning criteria for this credit. Any help would be greatly appreciated.

Last reply: Courtney Royal, Dec 22, 2020, 12:07 am

Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?

NC-v4.1 WEc2: Indoor water use reduction
posted by Catherine Blakemore on Dec 18, 2020, 12:07 pm

I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form.  There are no fixture options for for the following fixtures:

1)  Exam Room sinks or...

Last reply: emily reese moody, Dec 18, 2020, 5:38 pm

Wall Components

NC-v4 EQc2: Low emitting materials
posted by LUCY WILLIAMS on Jun 15, 2017, 10:15 am

When reporting for the wall, ceiling category under Option 1, do all of the interior partition components need to be complaint- the gypsum board, the tape, the joint compound, the studs and the...

Last reply: Tom Gibbons, Dec 16, 2020, 12:18 pm