Log in
Forum » Canada
Topic

CO2 monitoring for Core and Shell projects

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Irene Chung on Apr 9, 2017, 5:56 pm

Hi,

Is a copy of the lease agreement stating that tenants must install co2 sensors in all densely occupied spaces required for v4 Core and Shell projects?

If not, can the project...

Last reply: Laura Charlier, Nov 3, 2023, 2:57 pm

Split System AC in an existing building

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Charles Marshall on Aug 14, 2019, 4:58 pm

We are working on a major renovation project that contains several split system AC units which will be replaced.  The owner doesn't have any record of the refrigerant volume that was charged for...

Last reply: Gustavo De las Heras Izquierdo, Nov 1, 2023, 12:36 pm

Pressurized entryway vestibules at high-volume building entrances

Healthcare-v4 EQc1: Enhanced indoor air quality strategies
posted by Priscillia Champagne on Feb 1, 2021, 8:26 am

Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances. Is there a standard to follow or specific...

Last reply: , Oct 31, 2023, 1:34 pm

Contaminated material in a bulldozer demolition

NC-v4 MRp2: Construction and demolition waste management planning
posted by Priscillia Champagne on Jan 30, 2023, 3:12 pm

Hi LeedUser, 
We have a project to build a new school including a football field, 3 sports fields, a public plaza, a school bus drop-off and a parking lot. Project registered under LEED V4...

Last reply: Priscillia Champagne, Oct 30, 2023, 11:09 am

Irrigation Requirements

NC-v4 WEc1: Outdoor water use reduction
posted by Eslam Elshorbagy on Oct 18, 2023, 10:59 am

Hello,

We are further developing the details and plant mixes to increase biodiversity for a BD+C new construction. We have an approximately non-irrigated vegetated area of 55,000 sf and a...

Last reply: emily reese moody, Oct 19, 2023, 3:39 pm

Interior Renovations to Historic Building while maintaining historic status

NC-v4 MRc1: Building life-cycle impact reduction
posted by Dimuth Kurukulaarachchi on Jan 25, 2018, 12:28 pm

Would a project still qualify for Option 1 Historic Building Reuse if it has a local historic designation (requiring maintenance of the building exterior components)?  The...

Last reply: Douglas Flandro, Oct 17, 2023, 8:36 am

Systems requiring metering

CS-v4 EAc3: Advanced Energy Metering
posted by Tim Nabholz on Apr 4, 2017, 11:20 am

Hi All,

I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters. The credit requirements state "Install advanced...

Last reply: Tariq Muhammad, Oct 16, 2023, 1:49 pm

Anti-Ligature fixtures

NC-v4 WEp2: Indoor water use reduction
posted by Leanne Conrad on May 25, 2018, 12:59 pm

The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures? Our client requires...

Last reply: emily reese moody, Oct 5, 2023, 12:27 pm

Pursuing Whole Project Pilot in residential buildings

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Paul Erlichman on Oct 4, 2023, 10:44 am

Hello,
I posed a similar question in the forum for the Optimize Proces Water Use credit, but I figured I would post an addendum of sorts in the pilot credit forum.

My initial...

Low-flow WaterSense Devices

NC-v4 WEp2: Indoor water use reduction
posted by MAUDE PINTAL on Jun 15, 2020, 3:16 pm

Hello

Do you know models of bathroom faucets with a 0.5 gm flow that is WaterSense certified or certified aerators that can get the same flow?

Thank you,

Last reply: Aniket Singh, Sep 14, 2023, 4:57 pm