Log in
Forum » Spain
Loading...
Topic

Differences between design phase and construction phase

NC-v4 MPR3: Must comply with project size requirements
posted by JORDI CASTELLANO on Oct 15, 2018, 4:09 am

hello everyone,
our project has achieved the design phase of LEED review.
We are working in construction phase, and we have some distribution interiors differences from design phase...

Last reply: Tristan Roberts, Oct 15, 2018, 3:48 pm

Lighting controls requirements

Schools-2009 IEQc6.1: Controllability of systems - lighting
posted by Marina Curto on Oct 5, 2018, 2:07 am

Hi everyone, 

I'm working on a School project in v2009 and I have some doubts whether the lighting controls design would meet credit requirements. I have two different cases:

 -...

Envelope Cx- Blower door test

NC-v4 EAc1: Enhanced Commissioning
posted by Miguel Ángel Blanco on May 9, 2017, 7:42 am

Hello All,

We have a 5-floored building pursuing LEED CS v2009 certification, and also WELL certification. Envelope...

Last reply: Lyle Axelarris, Sep 6, 2018, 9:13 pm

Non potable water for irrigation and toilets flush

NC-2009 WEc1: Water Efficient Landscaping
posted by Karyn Rodrigues on Aug 10, 2018, 5:36 am

Hello! 

I have two sources of non-potable water in the project: gray and rainwater. These two sources, combined, are enough to supply my irrigation demand and also toilets flush for the...

Bike spaces usage

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Karyn Rodrigues on Jul 24, 2018, 4:02 am

Hello! I have a LEED NC project that is already operating and we are now finishing...

Last reply: Emily Purcell, Jul 24, 2018, 9:32 am

How many strategies are necessary to comply with Option 2?

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Raquel Clemente on Jul 18, 2018, 6:57 am

Hello,

The LEED CI guide states: Option 2. Additional enhanced...

Split certification doubts

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Marina Curto on Jun 21, 2018, 6:56 am

Good morning, 
We have some doubts regarding the possibility of doing a split certification (one for the design credits and another one for the construction credits). All the LEED...

Last reply: Michelle Reott, Jun 21, 2018, 10:17 am

Outdoor air

NC-v4 EAp2: Minimum Energy Performance
posted by Emmanuel Pauwels on Apr 4, 2016, 12:31 pm

In exception C in section G3.1.2.6 Ventilation, it states that 'If the minimum outdoor air intake flow in the proposed design is provided in excess of the amount required by the rating authority...

Last reply: Marcus Sheffer, Jun 15, 2018, 11:52 am

Changing rooms in adjacent LEED building

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Angel Guerra on Jun 30, 2017, 4:57 am

We have a project with an existing LEED adjacent building to the new LEED building.

Both buildings are conected by the interior and the exterior and owned by the same landlord. The...

Last reply: Sophie Kerr, Apr 30, 2018, 12:25 pm

Kitchen Faucets

NC-2009 WEp1: Water Use Reduction
posted by Angel Vega on Dec 14, 2016, 2:27 pm

The building I am trying to obtain the certification for, is a museum. It has two rooms with faucets for the cleaning staff. Are these faucets into the objetive of reduction?
Additionally,...

Last reply: Gerren Wagner, Apr 19, 2018, 4:55 pm