Measurement period

NC-2009 EAc5: Measurement and Verification
posted by Lise Dannesboe on Dec 5, 2017, 4:35 am

Hi.

we willa s minimum share 1 year of monthly energy consumptions with USGBC, but when should this periode start? People are moving into the building, but it is not fully occupied and we...

Last reply: Marcus Sheffer, Dec 5, 2017, 9:04 am

Painting

CS-2009 SSc7.1: Heat island effect - nonroof
posted by Lise Dannesboe on Nov 13, 2017, 2:22 am

Hi - is it possible to paint the pavement to get the wanted...

Distance between bicycle storage and bicycle network

NC-v4 LTc6: Bicycle facilities
posted by Lise Dannesboe on Oct 19, 2017, 6:26 am

Hi.

"Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter)...

Last reply: Calie Gihl, Nov 7, 2017, 3:48 pm

Labelling of waste containers

NC-v4 MRp2: Construction and demolition waste management planning
posted by Lise Dannesboe on Oct 18, 2017, 5:01 am

Hi.

A quick question, which I have not been able to find an answer to in the LEED manual. When labelling our waste containers is it a LEED requirement that it must be in english or is it...

Last reply: Kristina Bach, Oct 18, 2017, 8:30 am

Is inputting meters in the Whole Building model a MBCx requirement?

NC-v4 EAc1: Enhanced Commissioning
posted by Lise Dannesboe on Oct 13, 2017, 4:55 am

Hi. Is it understood correctly that all energy, water and electrical meters (we have a lot more meters than even required by LEED) are not required to be entered into the Whole Building...

Last reply: Marcus Sheffer, Oct 15, 2017, 12:17 pm

Use of Whole Building model to predict the energy consumption for each meter

NC-v4 EAc3: Advanced Energy Metering
posted by Lise Dannesboe on Oct 11, 2017, 10:49 am

Hi.

Hope some can help.

In the LEED 2009 version you had to enter the energy consumption for the different measured systems from the Whole building simulation in ordre to see in the...

Last reply: Lise Dannesboe, Oct 12, 2017, 1:59 am

Pilot- option 1- EPD

Pilot-Credits MRpc52: Material multi-attribute assessment
posted by Lise Dannesboe on Aug 3, 2017, 8:56 am

Hi.

As we are finalizing our last credits for approval of a project, a couple of question have come up in regards to this Pilot credit, option 1, EPD.

We have a total of 25 EPDs (...

Last reply: Kristina Bach, Aug 24, 2017, 3:15 pm

Construction Waste management

NC-2009 MRc2: Construction Waste Management
posted by Piotr Podhajny on Jul 22, 2016, 4:21 am

RETIRED LEEDuser Expert 622 thumbs up July 22, 2016- 12:32 pm Piotr- As a LEEDuser guest, you can't see the Bird's Eye View above, which provides additional details and tips. One of those tips discusses multiple buildings and construction waste. Please review this LEED Interpretation- http://www.usgbc.org/content/li-10265. Also, click the Single-page view at the bottom of this page and search this forum for answers to similar questions. If you still have questions, please post again. Log in or register to post comments ...

Last reply: RETIRED, Jul 22, 2016, 12:32 pm

Kitchen

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Sophie Brauer on Jun 21, 2016, 6:38 am

Hello,
I am having a lot of difficulty finding a (European) kitchen that qualifies for this credit. The suppliers and manufacturers we tend to use here in Denmark all have various...

Last reply: Jon Clifford, Jun 21, 2016, 11:11 pm

Open Space: Fence

NC-v4 SSc3: Open space
posted by Sophie Brauer on Apr 19, 2016, 8:42 am

Hello,
I'm trying to assess how much of our project site qualifies as open space. A large percentage of the site is extensively maintained grass and woodland planting, however there is a...

Last reply: Trista Brown, May 2, 2016, 11:49 am