Log in
Forum » Turkey
Topic

Regularly Occupied Space Area Calculation

NC-2009 PIf3: Occupant and Usage Data
posted by ESRA OZKONUKSEVER on Nov 27, 2015, 8:38 am

Dear All,
While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces?
Thank you!

Last reply: Jon Clifford, Nov 27, 2015, 2:14 pm

Assembly U-value Calculation

NC-2009 EAp2: Minimum Energy Performance
posted by MURAT DOĞRU on Sep 4, 2015, 3:13 am

Dear all,
I’d like to ask a question about the...

Last reply: Jean Marais, Sep 7, 2015, 4:16 am

the documentation language

NC-2009 SSc1: Site Selection
posted by ESRA OZKONUKSEVER on Jun 19, 2015, 2:44 am

hi everyone,
working on a project outside of U.S. I ve gathered the necessary equivalent documentation for this credit but it s all in the local language. I ve translated all the...

Last reply: Melissa Kelly, Jun 25, 2015, 4:39 pm

CSRs

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by NESLIHAN AKSOY on Feb 20, 2015, 8:47 am

These reports are very wide range ...but the credit is dealing with sources of...

Last reply: John Mlade, May 15, 2015, 11:00 pm

Storage Room with a small window

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Orçun Özhelvaci on Mar 22, 2015, 3:40 pm

Hi everyone,

Although I read almost all the comments related with the ventilation requirements of the storage rooms, I could not find the exact answer for my question.

In our...

Last reply: Dave Hubka, Mar 24, 2015, 9:39 am

P: avarage rainfall event

NC-2009 SSc6.1: Stormwater design - quantity control
posted by ESRA OZKONUKSEVER on Feb 11, 2015, 9:27 am

Hi everyone,
I got a question about the calculataion of Volume of captured run off;
In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi...

Data Center in on Office building Energy Modelling Calculations

NC-2009 EAc1: Optimize Energy Performance
posted by ESRA OZKONUKSEVER on Dec 19, 2014, 8:38 am

Hi all,
We re currently working on an office building project of 10.000 square meters and within the building there is a data center as big as 150 square meters.
we are plannig to...

Last reply: ESRA OZKONUKSEVER, Jan 23, 2015, 9:36 am

International Project Epa CGP

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by ESRA OZKONUKSEVER on Jan 23, 2015, 6:33 am

Hi Y'all,
we re working on a project in Turkey and creating an...

Last reply: Michael DeVuono, Jan 23, 2015, 8:00 am

Certification RQs for Incomplete Building

NC-2009 MPR2: Must be a complete, permanent building or space
posted by Orçun Özhelvaci on Dec 8, 2014, 11:11 am

Our university building undergoes it's construction stage.
After reading all above we have curtain doubts about further procedure on certification.

There are 2 main wings (refer to...

Last reply: Orçun Özhelvaci, Dec 11, 2014, 2:20 am

ventilation flow rate

CI-2009 IEQc2: Increased Ventilation
posted by ilkyaz ceren güçlü on Nov 10, 2014, 7:52 am

Hi,

We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas? (server rooms,technical rooms...