Topic

Baseline Ventilation Rate for Proposed design with DCV (not required under 6.4.3.9)

CS-2009 EAp2: Minimum Energy Performance
posted by Iqbal K. on Jan 22, 2018, 12:19 am

Dear Marcus,

I wish to ask you regarding the Baseline Ventilation rate.

There is no space within this project with spaces >500 ft2 with people...

Last reply: Iqbal K., Jan 22, 2018, 10:47 pm

Data Center- Baseline System and ACP

CS-2009 EAp2: Minimum Energy Performance
posted by Michael Wahjudi on Nov 15, 2017, 8:39 am

  1. Our development is having 767.47 sqm of supporting offices and 21,340.69 sqm of data center related area. Based on the COMNET Commercial Buildings Energy Modelling Guidelines and Procedures...

Last reply: Marcus Sheffer, Nov 16, 2017, 9:37 am

Very Minimum Wood Product

CS-2009 MRc6: Certified Wood
posted by Michael Wahjudi on Sep 21, 2017, 2:45 am

Hi our development is having stringent requirement for fire safety. Hence the amount of...

Last reply: Tristan Roberts, Sep 21, 2017, 9:42 am

Active freight rail

Warehouses-NC-v4 LTc4: Surrounding density and diverse uses
posted by Yong Lee Low on Jun 1, 2017, 4:47 am

Hi, in my country, we do not have freight rail (or railway to transport cargo from my understanding). We only transport cargo by ship or by plane. Can I still attempt to score for "active...

Last reply: Tristan Roberts, Aug 26, 2017, 10:09 am

Onsite solar PV generation- 10 years contract

EBOM-v4 EAc7: Renewable energy and carbon offsets
posted by Ameet AA on Apr 24, 2017, 12:14 am

Hi,

Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)? 10 years is too long for the building...

Last reply: Trista Little, Jun 26, 2017, 9:17 pm

Confidential space

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Ameet AA on Mar 30, 2017, 5:26 am

Hi,

The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area. About 25% of the floor area (on...

Last reply: David Posada, Apr 17, 2017, 5:50 pm

Open Plan office served by 4 AHUs

CI-2009 IEQp1: Minimum IAQ Performance
posted by Michael Wahjudi on Aug 23, 2016, 10:19 pm

Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices. The...

Last reply: Dylan Connelly, Jan 23, 2017, 10:01 am

Project located in a building with a very low fresh air rate

Retail-NC-v4 EQp1: Minimum indoor air quality performance
posted by Valentin Grimaud on Oct 24, 2016, 11:29 pm

What if the project is located inside a 30-year old building with...

Last reply: Tristan Roberts, Jan 17, 2017, 4:15 pm

Blind

CI-v4 EQc5: Thermal comfort
posted by Ameet AA on Oct 17, 2016, 10:13 pm

Hi,

Can blind be considered as control for thermal comfort? Thanks.

Last reply: Tristan Roberts, Jan 17, 2017, 2:41 pm

Campus Thermal Energy Plant Submission

General forums
posted by Michael Wahjudi on Nov 22, 2016, 9:51 pm

Hi. We have LEED Campus Development with 2 LEED projects inside. Let's call it "Development F" and "Development A". Development F is housing the thermal energy plant, hence exception for option 2...

Last reply: Michael Wahjudi, Nov 28, 2016, 8:48 pm