Forum » Singapore
Topic

Data Center- Baseline System and ACP

CS-2009 EAp2: Minimum Energy Performance
posted by Michael Wahjudi on Nov 15, 2017, 8:39 am

  1. Our development is having 767.47 sqm of supporting offices and 21,340.69 sqm of data center related area. Based on the COMNET Commercial Buildings Energy Modelling Guidelines and Procedures...

Last reply: Marcus Sheffer, Nov 16, 2017, 9:37 am

Very Minimum Wood Product

CS-2009 MRc6: Certified Wood
posted by Michael Wahjudi on Sep 21, 2017, 2:45 am

Hi our development is having stringent requirement for fire safety. Hence the amount of...

Last reply: Tristan Roberts, Sep 21, 2017, 9:42 am

Active freight rail

Warehouses-NC-v4 LTc4: Surrounding density and diverse uses
posted by Yong Lee Low on Jun 1, 2017, 4:47 am

Hi, in my country, we do not have freight rail (or railway to transport cargo from my understanding). We only transport cargo by ship or by plane. Can I still attempt to score for "active...

Last reply: Tristan Roberts, Aug 26, 2017, 10:09 am

Onsite solar PV generation- 10 years contract

EBOM-v4 EAc7: Renewable energy and carbon offsets
posted by Ameet AA on Apr 24, 2017, 12:14 am

Hi,

Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)? 10 years is too long for the building...

Last reply: Trista Little, Jun 26, 2017, 9:17 pm

Confidential space

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Ameet AA on Mar 30, 2017, 5:26 am

Hi,

The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area. About 25% of the floor area (on...

Last reply: David Posada, Apr 17, 2017, 5:50 pm

Open Plan office served by 4 AHUs

CI-2009 IEQp1: Minimum IAQ Performance
posted by Michael Wahjudi on Aug 23, 2016, 10:19 pm

Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices. The...

Last reply: Dylan Connelly, Jan 23, 2017, 10:01 am

Project located in a building with a very low fresh air rate

Retail-NC-v4 EQp1: Minimum indoor air quality performance
posted by Valentin Grimaud on Oct 24, 2016, 11:29 pm

What if the project is located inside a 30-year old building with...

Last reply: Tristan Roberts, Jan 17, 2017, 4:15 pm

Blind

CI-v4 EQc5: Thermal comfort
posted by Ameet AA on Oct 17, 2016, 10:13 pm

Hi,

Can blind be considered as control for thermal comfort? Thanks.

Last reply: Tristan Roberts, Jan 17, 2017, 2:41 pm

Campus Thermal Energy Plant Submission

General forums
posted by Michael Wahjudi on Nov 22, 2016, 9:51 pm

Hi. We have LEED Campus Development with 2 LEED projects inside. Let's call it "Development F" and "Development A". Development F is housing the thermal energy plant, hence exception for option 2...

Last reply: Michael Wahjudi, Nov 28, 2016, 8:48 pm

Using Chilled Water Pump similar to ASHRAE 90.1

NC-2009 EAp2: Minimum Energy Performance
posted by Michael Wahjudi on Aug 16, 2016, 2:33 am

Hi, we have development where the Chiller Plant is serving three buildings. Due to of the distance of the building, the Chilled Water pump head is quite high and we required to install Chilled...

Last reply: Marcus Sheffer, Aug 25, 2016, 9:16 am