Accra Certified ContactorsHomes-v4 EAc4: Active Solar-Ready Designposted by Filemon Kapuno on Feb 4, 2018, 9:01 am
The project is situated in southeast asia and there is no Acca certified contractor. Does it mean we will not get the credit? But we have PCab (certification for contractors) will they accept?... Last reply: Carissa Sawyer, Jan 21, 2019, 8:12 pm |
|
Energy Model Scope for CI Project with independent HVAC systemCI-v4 EAc2: Optimize Energy Performanceposted by Marie Garcia on Oct 9, 2018, 5:07 am
hi Marcus / hi everyone, We have a LEED CI project that is part of a 4 storey commercial building. Only portion of the Ground Floor will be part of the LEED CI project. Each tenant space... Last reply: Marie Garcia, Oct 10, 2018, 11:37 pm |
|
Cold Storage Energy ModellingNC-v4 EAp2: Minimum Energy Performanceposted by N Sai Balaji on Jun 28, 2018, 7:52 am
I am working on a cold storage project going for LEED certification , I am not able to understand the modelling procedure for the refrigerated spaces in eQuest. The project has a built up... Last reply: Marcus Sheffer, Jul 30, 2018, 3:38 pm |
|
ACCESS TO QUALITY TRANSITNC-v4 LTc5: Access to quality transitposted by jade dayday on Dec 15, 2017, 9:31 pm
hi, is it possible to earn a credit if our project offers a free ride to all occupants from the entrance to the nearest... Last reply: Marilyn Specht, Mar 21, 2018, 2:41 pm |
|
RP Credit Lookup: Invalid Location in the CityRetail-CI-v4 RPc1: Regional Priorityposted by Marjorie Oblinada on Jan 30, 2018, 2:42 am
Hi. My team is currently working on certifying a LEED v4 ID+C:Retail project and wishes to pursue the regional priority credits to gain additional points. We have indicated the geo location of... Last reply: Susan Walter, Jan 31, 2018, 1:52 pm |
|
transportation vehicleNC-v4 LTc5: Access to quality transitposted by jade dayday on Dec 12, 2017, 1:28 am
hi, im new to LEED. can we use approximation on the number of trips on public utility vehicles? Last reply: Tristan Roberts, Dec 12, 2017, 5:15 pm |
|
DOCUMENTATIONNC-v4 MPR1: Must be in a permanent location on existing landposted by jade dayday on Dec 11, 2017, 10:05 pm
hi i'm new on LEED, can we perform preliminary review of uploaded documents even if other requirements aren't completed? Last reply: Tristan Roberts, Dec 12, 2017, 5:14 pm |
|
LEED Compliant FaucetsNC-v4 WEp2: Indoor water use reductionposted by Ann E on Oct 19, 2017, 1:49 amJens Apel LEEDuser Basic Member 134 thumbs up October 19, 2017- 1:59 am In Europe, many manufacturers do not have compliant faucets, and test pressure is different to LEED requirements. What we normally suggest is the use of pressure independent aerators that just replace the standard aerators in the faucets. They work with a lot of faucets, should be pretty low cost and allow the architects to select faucets from a larger variety of manufacturers and designs. I am unsure if forum rules prohibit promotion of specific manufacturers. In past projects we used products from www.neoperl.com, not sure... Last reply: Ann E, Nov 28, 2017, 9:39 pm |
|
EPD of Products/MaterialsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Ann E on Oct 22, 2017, 10:22 pm
We are in our process of gathering and submitting our papers for LEED requirements but we our having a trouble regarding the EPD since none of our suppliers have a certification on hand. ... Last reply: Nadav Malin, Oct 25, 2017, 8:25 pm |
|
EPDCI-v4 MRc3: Building product disclosure and optimization - environmental product declarationsposted by Ann E on Oct 19, 2017, 4:35 am
Hi! Is EPD for finish products/materials only or also for raws? Can you give examples of products/materials with EPD's? I'm recently handle this LEED project so I'm a little bit struggling... Last reply: Nadav Malin, Oct 25, 2017, 8:24 pm |