Sample documents for this creditCI-v4 EQc5: Thermal comfortposted by nasrin belim on Apr 25, 2020, 2:24 am
Hi LEED User Please if available than share the sample documentation or chart for CIv4-EQc5 Thermal Comfort thanks Last reply: Karen Joslin, Apr 28, 2020, 1:30 am |
|
LEED EB v4.1- Data CentersEBOM-v4.1 EAp3: Energy Performanceposted by Vanni arasan on Mar 23, 2020, 11:24 am
I am working on LEED v4.1 EB O&M Datacenter rating system, I haven't getting Energy Performance score. Please advise how to enter the energy data i.e., Whole Facility Energy Consumption... |
|
Leed ap in innovation creditNC-v4 INc2: LEED Accredited Professionalposted by Vidya Thota on Feb 8, 2018, 10:37 pm
What are the roles of leed ap in the project? Last reply: Dave Hubka, Mar 18, 2020, 11:49 am |
|
Enhanced Commissioning V4NC-v4 EAc1: Enhanced Commissioningposted by Prakash Sekar on Feb 1, 2020, 5:15 am
Can u share the sample submittal document for Enhanced Commissioning V4 |
|
Modeling Evaporative cooling systems (ambiator)NC-2009 EAp2: Minimum Energy Performanceposted by Visu Boj on Sep 29, 2015, 3:26 am
Hi all, Last reply: Marcus Sheffer, Dec 22, 2019, 5:24 pm |
|
Exterior Lighting control for 24x7 operating buildingNC-v4 EAp2: Minimum Energy Performanceposted by Rathnashree Bharadwaj on Jul 27, 2018, 2:28 am
We have a commercial building which is 24x7 operating. How do we comply with the 9.4.1.7 b., 9.4.1.7c requirements when the building does not have any business closing or business opening hours... Last reply: Waleed AlGhamdi, Dec 10, 2019, 11:22 am |
|
Water discharge into Municipal STPEBOM-v4.1 WEc1: Water Performanceposted by Kumar Biplab on Sep 10, 2019, 6:07 am
Background:- The building is part of a planned township and the township is maintained by municipality. Municipality also supplies potable water to the building through metered connection. During... |
|
LEED v4-Credits MR-USGBC approved programCI-v4 MRc3: Building product disclosure and optimization - environmental product declarationsposted by Dipti Talwar on Feb 3, 2016, 4:45 am
Dear all, Last reply: Megan Recher, Jul 22, 2019, 3:38 pm |
|
Basic Amenities Within the Main BuildingCI-2009 SSc2: Development Density and Community Connectivityposted by Aswin M on Dec 31, 2015, 2:01 am
We have a Retail Commercial Interior project inside a Main building. The Main building has many amenities such as restaurant,library, departmental stores, beauty salon, etc,. which are open to... Last reply: Ranya Metwalli Shields, Jul 7, 2019, 6:56 am |
|
Core and shell building’s energyCS-v4 EAc5: Renewable energy productionposted by Devendra Chaughule on Jun 27, 2019, 10:34 am
Dear All, We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by... Last reply: Marcus Sheffer, Jun 27, 2019, 11:11 am |