Log in
Forum » Bangladesh
Topic

Bamboo Flooring to be considered in certified wood calculations

NC-2009 MRc7: Certified Wood
posted by ABDUL MUTHALIB MOHAMED on Apr 29, 2016, 3:14 am

We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified...

Last reply: Tristan Roberts, Jan 17, 2017, 6:52 pm

n/a

NC-2009 EAc1: Optimize Energy Performance
posted by SAMY Chamy on Jan 28, 2016, 12:25 pm

SAMY Chamy Enginneer T&T Green LEEDuser Basic Member 12 thumbs up January 29, 2016- 10:44 am Awaiting for ur reply Log in or register to post comments Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11473 thumbs up January 29, 2016- 11:00 am Samy, Marcus and others volunteer a huge amount of time on this forum. Please be patient—you may not get an answer within hours or days. If a question does not get answered, please consider simplifying it or doing more research on your own.Also please understand that experts like Marcus are often hired as consultants...

Last reply: Victoria Watson, Oct 18, 2016, 12:51 pm

Outdoor Air Delivery Monitoring- Installation of CO2 sensors

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by SAMY Chamy on Jun 3, 2016, 8:35 am

1. CO2 sensors are installed in our project, but not interconnected with fresh air fans....

Last reply: Andrew Mitchell, P.E., Jun 6, 2016, 10:11 am

Dormitory as support building

NC-2009 PIf2: Project Summary Details
posted by ABDUL MUTHALIB MOHAMED on Apr 29, 2016, 3:03 am

We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only. In the same campus, 20 feet away, we have a dormitory building...

Last reply: Alan Scott, Apr 29, 2016, 8:24 am

Venlilation Spaces Only

NC-2009 EAp2: Minimum Energy Performance
posted by SAMY Chamy on Apr 16, 2016, 3:43 am

Dear All:-

Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model

As per LEED Missing manual we follow below things
"Assign...

Last reply: Marcus Sheffer, Apr 17, 2016, 5:59 pm

Permanent Land /Space Requirement (MPRPp2)

NC-2009 MPR2: Must be a complete, permanent building or space
posted by al-emran hossain on Mar 27, 2016, 7:48 am

Hi LEED Expert ,
We want to know about Minimum Program Requirement (MPRPp2)of permanent space/land matter. Our client has 20 years lease land from BD Gov and build NC factory as a LEED...

Last reply: Tristan Roberts, Mar 27, 2016, 6:49 pm

Energy modeling for LEED project (v3) requirement or not

LEED Rating System Selection
posted by al-emran hossain on Feb 27, 2016, 3:12 pm

We are going to start LEED project (Gold, points 66) in RMG factory at Bangladesh , if we will not consider in energy modeling for v3, that will accept or not , and required then which energy...

Last reply: Saud Abdul Rasheed, Feb 28, 2016, 12:28 am

2 year 24 hour design storm

NC-2009 SSc6.1: Stormwater design - quantity control
posted by ABDUL MUTHALIB MOHAMED on Dec 16, 2015, 8:04 am

December 16, 2015- 1:28 pm You do not have enough data to discern anything from what you have posted. What you are trying to do is not easy, and is well outside the scope of this forum. I suggest you read...

Last reply: Omar Elrawy, Dec 20, 2015, 7:55 am

Water Efficiency Calculation

NC-2009 WEc2: Innovative Wastewater Technologies
posted by ABDUL MUTHALIB MOHAMED on Dec 19, 2014, 8:07 am

Hi,
My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used? Can we give flow rate as 0 and...

Last reply: Tristan Roberts, Nov 27, 2015, 2:36 pm

Factory Area Classification

NC-2009 IEQc2: Increased Ventilation
posted by SAMY Chamy on Jul 20, 2015, 10:34 am

We have Projects in Bangladesh
1.It have sewing area, Workspaces in which category we classify it (Ashrae 62.1)

1.Sewing Area
2.Cutting Area
3.Inspection area

i...

Last reply: Jon Clifford, Jul 27, 2015, 8:38 pm