Log in
Forum » Europe – Southern
Topic

Baseline for Projects with Several Physically Distinct Structures

NC-v4 MPR3: Must comply with project size requirements
posted by Mike Mentzos on Sep 15, 2023, 6:57 am

All,

We are currently working on a hotel project, which consists from several buildings the sum of them is about 4,000 square meters. Each individual bulding is not greater than 2,300...

Rainwater Management

NC-v4 SSc4: Rainwater management
posted by Ribert Senzoga on Sep 5, 2023, 12:52 pm

I am evaluating the Rainwater Management of a warehouse project where the water table is very high and we don't have enough depth to make a water basin. Does LEED have any suggestion to deal with...

locker roms

Pilot-Credits WEpc147: All-Gender Restrooms
posted by Belén Palao on Apr 27, 2022, 12:45 pm

Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 180 thumbs up April 28, 2022- 11:21 am Hi, Miguel! I'm hoping someone on here might have an answer for you. However, just keep in mind that posting to LEEDuser is not the same as writing to LEED Coach. This is an independent grassroots forum. The email for LEED Coach is leedcoach@usgbc.org. Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic Member 10 thumbs up March 13, 2023- 9:12 am Dear Miguel, Have you received any feedback from the LEED...

Last reply: Vanessa Hostick, Aug 14, 2023, 12:05 pm

All campus occupants will use showerheads inside our building

NC-v4 WEp2: Indoor water use reduction
posted by Paola Moschini on Aug 7, 2023, 8:30 am

Our building is on a campus (industrial facility where all workers need to make a shower at the end of the worktime) and our building provides restroom facilities with showerheads for all other...

Last reply: Emily Purcell, Aug 7, 2023, 12:14 pm

Ventilation Warehouses

NC-v4 EQp1: Minimum indoor air quality performance
posted by Helena Garcia on Jun 20, 2016, 4:12 am

We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain.
The question is for the warehouse, this warehouse is not conditioned...

Last reply: Emma Loris, Jul 26, 2023, 12:28 am

Ventilation in corridors

NC-v4 EQp1: Minimum indoor air quality performance
posted by Luana Jerez on Jul 18, 2023, 9:30 am

We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices. These offices are equipped...

Regional ACP for LEM VOC Emissions Evaluation- Manufacturer statement

NC-v4.1 EQc2: Low-emitting materials
posted by Muhammad Mahasneh on May 10, 2023, 3:54 am

Greetings,

i would like to ask about the April 2023 Update to the Regional ACP ID# 100002473 regarding Low Emitting materials:

"Laboratories that conduct the tests must be...

Last reply: Paula Melton, Jul 6, 2023, 9:14 am

Ratio Windows/Wall in baseline model Table G1.1.1-1

NC-v4.1 EAp2: Minimum Energy Performance
posted by Marc Maso on Jun 23, 2021, 12:10 pm

Dear Srs, I hace a question about the ratio windows/walls in leed v4.1. Is for a building with two differents uses: 3.117 m2 of office and 13.472m2 of warehouse.

When we had modeled the...

Last reply: Mark Terpstra, May 31, 2023, 4:40 pm

5.4.3.2 Air Leakage application in no heated or cooled spaces

Warehouses-NC-v4 EAp2: Minimum Energy Performance
posted by Paola Moschini on May 30, 2023, 5:20 am

About Mandatory Provision ASHRAE 90.1-2010 point 5.4.3.2 Air Leakage. Must this prescription be applied also to fenestration and doors of a warehouse not heated or cooled? We are in Climate zone...

Last reply: Marcus Sheffer, May 30, 2023, 10:43 am

GHG emission factor- renewable energy and operating hours-EA energy performance O+M v4.1

EBOM-v4.1 EAp3: Energy Performance
posted by RICCARDO BALLESIO on May 18, 2023, 6:30 am

Hello everyone, 

in the previous version LEED...