Calculation methodology

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Marion THIBAULT on Jul 2, 2019, 8:51 am

We are currently carrying out a DATA CENTER in France for which we aim for a LEED certification. We have some problems interpreting the EAp1 requirement and perhaps you can help us answer our...

Size of shower and changing facilities

Data-Centers-NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jun 27, 2019, 8:42 am

Hi,

Do we have minimum requirements for the size and configuration of changing facility shower ?

Thanks
Marion

Entryway systems for delivery

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Christine Recke on Jun 24, 2019, 9:34 am

Hi everyone,

we have a project that includes a delivery entry, which is only used by the responsible service staff for the delivery operation. 

To our mind this delivery entrance is...

Last reply: Mohammad H Abbasi, Jun 24, 2019, 10:44 am

Heat rejection

NC-v4 EAp2: Minimum Energy Performance
posted by Hagen Bork on Jun 3, 2019, 7:41 am

Can you define what "heat rejection" is? I'm not exactly sure which energy counts towards "heat rejection".

Is it the amount of energy that the cooling unit needs to eject the heat...

Last reply: Marcus Sheffer, Jun 3, 2019, 4:48 pm

Bikeshare requirements

NC-v4.1 LTc6: Bicycle facilities
posted by Maria sAra Di maggio on Apr 29, 2019, 6:17 am

Hi,

How many shared bicycle stations need to be implemented in order to reduce the long term and short term bicycle facilities by 50%?

Regards

Maria

...

Last reply: Max Krueger, Apr 30, 2019, 3:44 pm

Limits for VOC content outside US, additional questions

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Johannes Misensky on Apr 17, 2019, 12:14 pm

All the limits on...

Submitting a credit during the review process which was not submitted at first application

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Johannes Misensky on Apr 17, 2019, 6:58 am

I have a general question regarding the review process:

Say, you have already submitted a certain amount of credits for review and received a preliminary review.

While some credits...

Last reply: Michael Smithing, Apr 17, 2019, 11:16 am

validity of LEED certificate (LEED-CS v2009); necessary period of USGBC membership

Performance Period
posted by Ernst Schriefl on Oct 1, 2018, 6:42 am

We are in the process of certifying several buildings under a campus approach (LEED Master Site D+C), where each building / project is certified unter the LEED-CS v2009 rating system.

The...

Last reply: Trista Little, Apr 11, 2019, 9:16 pm

Bicycle racks distance

CS-v4 LTc6: Bicycle facilities
posted by Guillaume Rose on May 28, 2018, 5:41 am

Hi, 

In my Project, there are 2 bicycle areas : 

- 1 at the same level as the entrance but the distance is more than 30 meters

- 1 in the basement, but a lift dedicated to...

Last reply: Emily Purcell, Mar 27, 2019, 9:57 am

Double skin facade

NC-v4 EAp2: Minimum Energy Performance
posted by Sarah Leenknegt on Mar 12, 2019, 3:48 am

Hi

How do I model a naturally ventilated double skin facade in proposed and baseline building?

- proposed building: as designed, with a thermal zone for the intermediate area. The...

Last reply: Sarah Leenknegt, Mar 26, 2019, 3:21 am