Log in
Forum » Poland
Topic

process water- restaurant?

NC-v4 WEc4: Water metering
posted by Agata Mozer on Oct 29, 2019, 8:15 am

We have a New construction project - offices with a restaurant on the groud floor. Does anyone know if water use for the purpose of the restaurant can be considered process water?

Last reply: Tristan Roberts, Nov 4, 2019, 7:28 pm

ASHRAE 5.4.3.4 vestibules

NC-v4 EAp2: Minimum Energy Performance
posted by Agata Mozer on Oct 25, 2019, 12:20 pm

Section 5.4.3.4 of ASHRAE 90.1-2010 requires enclosed vestibules at building entrances ("Building entrances that separate conditioned space from the exterior shall be protected with an enclosed...

Last reply: Marcus Sheffer, Oct 29, 2019, 9:50 pm

Innovation: WELL Features in v3

NC-2009 IDc1: Innovation in Design
posted by Agata Mozer on Sep 12, 2019, 8:20 am

Hello,
I would like to ask if innovation credit from LEED v4 ‘WELL Features’ can be acceptable in LEED v3 in the innovation category?
Thank you in advance for your answer.

Last reply: Tristan Roberts, Sep 20, 2019, 4:38 pm

CHP Modeling patch confusion

NC-v4 EAp2: Minimum Energy Performance
posted by Przemysław Rejczak on Jun 26, 2019, 11:48 am

Dear Everyone,

Many of our buildings are connected to...

Last reply: Tyler Thumma, Sep 12, 2019, 7:50 pm

Daylight and Quality of Views Calculator Not Working

CI-v4 EQc8: Quality Views
posted by Steven Wychorski on Dec 17, 2018, 6:19 am

Is anyone having a problem with the downloaded Daylight and views calculator?

It's not summarizing my SqM. I've added 50 rooms and the access for view cell number stays exactly the same,...

Last reply: Hoda Ibrahim, Sep 8, 2019, 6:32 am

elements mounted on Velcro

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Agata Mozer on Aug 28, 2019, 6:38 am

Hello,

In one of our project, the contractor wants to apply acoustic panels mounted to walls on Velcro. The acoustic panels contain built-in plywood. Do we have to check credit compliance...

Kitchen Equipments

Retail-NC-v2009 EAc1: Optimize Energy Performance
posted by Przemysław Rejczak on Jul 31, 2019, 1:34 pm

Dear Everyone,

I am writting to enquire about Table 1-4 and Process Load Calculator that needs to be uploaded under EAc1 section.

We are creating and energy model of fast food...

sales area and the location of bins

CI-v4 MRp1: Storage and Collection of Recyclables
posted by Agata Mozer on Jul 22, 2019, 10:37 am

Hello,
Our retail project consists of sales area available for visitors/staff and office/administrative part available only for stuff. The investor want to put collection bins for...

Last reply: Jim Nicolow, Jul 22, 2019, 1:13 pm

VOC emission evaluation category for OSB in plasteboard walls

NC-v4.1 EQc2: Low-emitting materials
posted by Agata Mozer on Jun 28, 2019, 5:02 am

Hello,

It is common practice to use...

E-waste

CI-v4 MRp1: Storage and Collection of Recyclables
posted by Agata Mozer on May 24, 2019, 10:07 am

Is it enought that the tenant only will provide a safe storage for e-waste or is it required that the building also provides a central storage for all tenants?

Last reply: Jim Nicolow, May 24, 2019, 12:57 pm