Log in
Forum
Loading...
Topic

WELL CE Courses

WELL v1 Building Standard Tipsheet
posted by Sriranjani Ramachandran on Oct 17, 2019, 6:21 pm

Hello everyone, 

Where can I find WELL CE courses? 

Thanks

Ranjani 

Last reply: Carina Clark, Oct 18, 2019, 4:43 pm

Can help in earning low VOC credit?

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Anushka Singh on Oct 18, 2019, 12:58 pm

If we follow all the SMACA guidelines strictly, is it possible to earn the low...

Equipment Power Density for Plant Room

CS-v4.1 EAc2: Optimize Energy Performance
posted by Chi Hung Yip on Oct 18, 2019, 5:38 am

I need to input a figure for the equipment power...

Vertical Garden / Green Wall- qualified for vegetation requirement?

CS-v4 SSc3: Open space
posted by Miriam Faith Oafallas on Oct 18, 2019, 2:41 am

Our project proposes a green wall to be planted with appropriate vegetation and climbers. Please advise whether this wall surface can contribute to the vegetation calculations for SSc3 and SSc2...

Does the LCA must cover the 100% of building envelope and structural elements?

NC-v4 MRc1: Building life-cycle impact reduction
posted by Sara YOUSSOUFI on Oct 16, 2019, 12:20 pm

To earn the 3 points on this credit, Question 1: Do I need to know life cycle analysis for 100% of my structural and envelope products? Even small products like tightness, ...? steel that exists...

Last reply: Panu Pasanen, Oct 18, 2019, 4:15 am

Demountable Partition "Category"

CI-v4 EQc2: Low emitting materials
posted by Carina Clark on Oct 17, 2019, 5:32 pm

Curious if Demountable partitions are categorized as a furniture item, or if it's considered "walls" and each part (glass, frame, etc) is separated in the LEM spreadsheet?

Can a project have a different CxA for Fundamental and Enhanced Commissioning?

CI-v4 EAc1: Enhanced Commissioning
posted by Renee Shirey on Jan 15, 2019, 2:35 pm

Our project went forward with Fundamental Commissioning using a member of the Engineering firm (disinterested party, not involved in any way with the design/engineering/construction of the...

Last reply: Paul Meyer, LEED Fellow, Oct 17, 2019, 4:48 pm

Restaurant: LEED V4 ID+C Commercial Interiors or LEED V4 ID+C Retail?

LEED Rating System Selection
posted by Javier Manzanero on Nov 14, 2017, 7:52 am

Hi!

I'm registering a project about a restaurant, and I'm not sure if I have to use LEED V4 ID+C Commercial Interiors or LEED V4 ID+C Retail.

I don...

Last reply: Tristan Roberts, Oct 17, 2019, 4:12 pm

Post-consumer recycled content vs pre-consumer recycled content- LEED V3 excel datasheet

NC-v4.1 MRc4: Building product disclosure and optimization - material ingredients
posted by Mateus Souki on Oct 17, 2019, 11:31 am

I am working on a project where I must choose the materials for the MRc4 credit - LEED V3 (gold certification). However, as an architect responsible, I don't know if I should accept materials...

Last reply: Carina Clark, Oct 17, 2019, 3:15 pm

construction indoor air quality management plan

NC-v4 EQc3: Construction indoor air quality management plan
posted by Anushka Singh on Oct 17, 2019, 12:22 pm

Why was the construction...

Last reply: Paula Melton, Oct 17, 2019, 12:28 pm