Log in
Forum
Loading...
Topic

Existing Fenestration in baseline model for CI projects

CI-v4 EAp2: Minimum Energy Performance
posted by Aravindraj RB on Dec 4, 2019, 11:21 pm

Project type       : LEED ID+C (CI) Version 4

Query                : EA Pr. Minimum Energy Performance (Table G 3.1.5)

Our project is a commercial office building space with a...

JUST Disclosure: Internal Communications

Pilot-Credits IPpc90: Social equity within the project team
posted by Allison Wilson on Mar 8, 2019, 11:29 am

Less a question and less specific to how to document IPpc90, my organization has just published its JUST disclosure and has embarked on an internal communications program to increase the impact...

Last reply: David Posada, Dec 4, 2019, 9:15 pm

Definition of Homes

ND-Plan-v4 GIBp2: Minimum building energy performance
posted by Edmar Cabra on Nov 24, 2019, 5:45 am

We are developing a contraction village that will house contractors for the adjacent new development. The construction village will have accommodation units and support facilities (e.g....

Last reply: David Posada, Dec 4, 2019, 7:00 pm

how do you manage providers that provide the right materials for LEED?

Pilot-Credits SSpc55: Bird collision deterrence
posted by kim sung on Oct 27, 2019, 10:29 am

Hello.

There is a question as a preliminary contractor for bird collision deterrence.

If I had a way to lower a threat factor to 15 or less as an alternative to bird collision,...

Last reply: Stephanie Graham, Dec 4, 2019, 6:23 pm

Bird Collision Deterrence

Pilot-Credits SSpc55: Bird collision deterrence
posted by Long Wang on Jun 24, 2018, 11:03 am

Hi, I have two questions of this pilot credit for our LEED EB: O+M project V4.

First, what specific requirements for the external facade, especially the glass. The other one is the...

Last reply: Stephanie Graham, Dec 4, 2019, 5:50 pm

Standard reference for Canadian projects

Pilot-Credits SSpc55: Bird collision deterrence
posted by Josée Lupien on Nov 28, 2019, 1:37 pm

Hello,

I would like to know if the new CSA A460:19 Bird-Friendly Building Design can be used for canadian project to acheive this pilot credit?

How can I aks the USGBC to consider...

Last reply: Stephanie Graham, Dec 4, 2019, 5:30 pm

Quality Views Review Comment

CI-v4 EQc8: Quality Views
posted by Mario Angelo Pinoli on Jul 5, 2019, 12:17 pm

Hi,

I received a Design Review Comment for my project which says:

"No...

Last reply: Mariana del Valle, Dec 4, 2019, 12:09 pm

Monitoring: Natural Ventilation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Premal Solanki on Jun 5, 2018, 2:42 pm

We are working on a residential project (5-Story) that is being certified v4 BD+C. The dwelling units are naturally ventilated. The monitoring requirement for natural ventilation in v4 states to...

Last reply: Chen Shalita, Dec 4, 2019, 7:12 am

NC-v4.1 Rainfall Events Calculator

NC-v4.1 SSc4: Rainwater management
posted by Kathryn Ganas on Jul 17, 2019, 12:20 pm

Is there an updated Rainfall Events Calculator for v4.1?? We have a...

Last reply: Maria Porter, Dec 4, 2019, 6:49 am

No refrigerants used in project

NC-v4 EAp4: Fundamental Refrigerant Management
posted by Michael Cerom on Dec 2, 2019, 11:18 pm

Hi, maybe this question could also apply to the Enhanced Refrigerant Management Credit,
My question is, if my project do not use any refrigerants, do I automatically qualify for this...

Last reply: David Hubka, Dec 4, 2019, 5:26 am