Topic | Recent |
---|---|
SRI VALUE OF SOLAR ROOFNC-v4 SSc5: Heat Island Reductionposted by Shameen Dharmasena on Nov 4, 2021, 7:26 am
Hello, If a roof totally covered with Solar Panels, then how to calculate... Last reply: Melvina Pramadya Puspahati, Mar 25, 2024, 6:06 am |
|
PV panels on RoofCS-v4 SSc5: Heat Island Reductionposted by Andrea Tirao on Jul 6, 2017, 3:12 am
Hi, Last reply: Melvina Pramadya Puspahati, Mar 25, 2024, 6:00 am |
|
Industrial Process Loads and the Exceptional Calulation MethodNC-2009 EAc1: Optimize Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Apr 16, 2014, 4:22 pm
We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use. Therefore, even if the non-process building portion was Net Zero Energy, we would not... Last reply: Farooq Saeed, Mar 25, 2024, 1:39 am |
|
Modeling only conditioned areaNC-v4 EAp2: Minimum Energy Performanceposted by Omar Elrawy on Dec 9, 2020, 10:05 pm
I'm certifying a huge factory with an attached office building. Is it possible to model only the office area? Last reply: Farooq Saeed, Mar 25, 2024, 1:38 am |
|
What if Question- Bathroom removed from scope, how to comply with WEp1?CI-v4 WEp1: Indoor water use reductionposted by Edgar Arevalo on Mar 21, 2024, 2:57 pm
How would a project comply with WEp1 if the bathroom was removed from scope. This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of... Last reply: Edgar Arevalo, Mar 22, 2024, 4:20 pm |
|
Walk off mats for skyway entranceNC-v4 EQc1: Enhanced indoor air quality strategiesposted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm
Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "... Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm |
|
Storage locationNC-v4 MRp1: Storage and Collection of Recyclablesposted by Maiz Rech on Sep 11, 2023, 1:33 pm
Is there a minimum distance or positioning requirement for this area? Would it be a problem to locate the recyclables storage on the building underground floor? Last reply: Thomas Lagarde, Mar 22, 2024, 2:28 pm |
|
Buildings within site but not under LEED scopeNC-v4 EQp2: Environmental tobacco smoke controlposted by Marwa Elzoghby on Mar 22, 2024, 10:44 am
I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to... |
|
JUST Certificate- Pilot Credit: Social Equity Within the Project TeamNC-v4 INc1: Innovationposted by Alison Rosso on Aug 8, 2023, 7:39 pmof the design team" of this Pilot credit and will submit our JUST label for a LEED v4 ID+C Project. The credit requires the following: 1. Pilot credit registration 2. LEEDuser forum participation 3. Pilot... Last reply: Douglas Flandro, Mar 22, 2024, 10:31 am |
|
Option 2- Carbon dioxide monitoringNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Marina Curto on Mar 8, 2019, 5:32 am
We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered. Are we... Last reply: Afogreen Build, Mar 21, 2024, 11:47 pm |