Radiant Temperature

EBOM-v4 EQc3: Thermal comfort
posted by Craig Wilson on Jun 16, 2021, 11:55 am

What is the difference between air temperature and radiant temperature?

Last reply: Michael Yi, Jul 29, 2021, 11:52 pm

Existing hill plant

EBOM-v4 SSc1: Site development - protect or restore habitat
posted by Omar Elrawy on Oct 26, 2020, 2:40 am

We have an area in our existing project's boundry that has few vegetated area, but the whole area was not touched by the owner or by anyone before.

My question is that, if we leave this...

Last reply: Michael Yi, Jul 29, 2021, 10:33 pm

Furniture

NC-v4.1 EQc4: Indoor air quality assessment
posted by Sharon Bessa on Jul 28, 2021, 7:10 pm

What needs to be in the building during the air samples? I am confused about "moveable" furniture with "workstations and partitions" as examples when these are not really "moveable". The project...

Last reply: Russ Pellegrino, Jul 29, 2021, 2:09 pm

MRc2 BPDO EPD Option 2 Multi Attribute Optimization

NC-v4.1 MRc2: Environmental Product Declarations
posted by Sarah Linke on Feb 24, 2021, 3:24 pm

Has anyone had success pursuing credit for the BPDO EPD Option 2 (Multi Attribute Optimization)? The companies I have had success finding documentation for are as follows: 

Owens Corning (...

Last reply: Tommy Linstroth, Jul 29, 2021, 12:29 pm

"Fixed Spray irrigation only permitted on Turfgrass"

NC-v4 WEp1: Outdoor water use reduction
posted by Green Projects on Jul 21, 2021, 8:59 am

When the Watersense Water Budget Tool is completed with 'fixed spray' selected as irrigation type for trees and shrubs, it produces a warning in red text that says, "Fixed Spray irrigation only...

Last reply: Afogreen Build, Jul 29, 2021, 5:53 am

Option 1, path 2 flushout hours

NC-v4 EQc4: Indoor air quality assessment
posted by Susan Di Giulio on Jul 28, 2021, 8:57 pm

Hi all, 

Simple question but I do not see it addressed anywhere. We are planning to do the partial flush out during occupancy option. Once we have flushed with the required amount of air...

All landscaped areas removed

NC-v4 WEp1: Outdoor water use reduction
posted by Lou Niles II on May 3, 2021, 6:04 pm

It does not appear LEED give credit for removig all landscaped areas from the exiwting conditions? or at least I cannot find a path for that. New Project Rennovation that is removing all...

Last reply: Afogreen Build, Jul 28, 2021, 8:22 pm

CDPH Standard Method v1.1-2010

NC-v4 EQc2: Low-emitting materials
posted by Katherine Bachman on Feb 13, 2014, 5:24 pm

Moderator 824 thumbs up October 11, 2014- 2:45 pm Hi Dwayne,I'm hoping that you or someone else on this forum can help me understand the Adhesive and sealant requirements. I get that they have to meet...

Last reply: Reinhard Oppl, Jul 28, 2021, 8:00 pm

EDP documents

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by David Dixon on Dec 28, 2016, 4:54 pm

working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth

Last reply: Christian Mayer, Jul 28, 2021, 12:45 pm

Volume Measurement

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Rosenberger on Feb 27, 2018, 2:06 pm

is monitoring forums like this to see that teams are taxed by impractical LEED v4 requirements as out outline in your last paragraph. Log in or register to post comments RETIRED LEEDuser Expert 624 thumbs up...

Last reply: Michelle Rosenberger, Jul 28, 2021, 12:37 pm