Commercial Kitchen Query

CI-v4 EAp2: Minimum Energy Performance
posted by padma priya on Mar 7, 2024, 6:30 am

In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. 

Last reply: Marcus Sheffer, Mar 25, 2024, 9:48 am

SRI VALUE OF SOLAR ROOF

NC-v4 SSc5: Heat Island Reduction
posted by Shameen Dharmasena on Nov 4, 2021, 7:26 am

Hello, 

If a roof totally covered with Solar Panels, then how to calculate...

Last reply: Melvina Pramadya Puspahati, Mar 25, 2024, 6:06 am

PV panels on Roof

CS-v4 SSc5: Heat Island Reduction
posted by Andrea Tirao on Jul 6, 2017, 3:12 am

Hi,
Our project has parking on basement, GF+1F office spaces, then roof is covered almost entirely of PV panels. Having the above conditions, we are initially assessing if we can either...

Last reply: Melvina Pramadya Puspahati, Mar 25, 2024, 6:00 am

Industrial Process Loads and the Exceptional Calulation Method

NC-2009 EAc1: Optimize Energy Performance
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Apr 16, 2014, 4:22 pm

We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use. Therefore, even if the non-process building portion was Net Zero Energy, we would not...

Last reply: Farooq Saeed, Mar 25, 2024, 1:39 am

Modeling only conditioned area

NC-v4 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Dec 9, 2020, 10:05 pm

I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?
The factory is high on process loads, which will make it impossible to achieve...

Last reply: Farooq Saeed, Mar 25, 2024, 1:38 am

What if Question- Bathroom removed from scope, how to comply with WEp1?

CI-v4 WEp1: Indoor water use reduction
posted by Edgar Arevalo on Mar 21, 2024, 2:57 pm

How would a project comply with WEp1 if the bathroom was removed from scope.  This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of...

Last reply: Edgar Arevalo, Mar 22, 2024, 4:20 pm

Walk off mats for skyway entrance

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm

Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "...

Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm

Storage location

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Maiz Rech on Sep 11, 2023, 1:33 pm

Is there a minimum distance or positioning requirement for this area?

Would it be a problem to locate the recyclables storage on the building underground floor?

Last reply: Thomas Lagarde, Mar 22, 2024, 2:28 pm

Buildings within site but not under LEED scope

NC-v4 EQp2: Environmental tobacco smoke control
posted by Marwa Elzoghby on Mar 22, 2024, 10:44 am

I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to...

JUST Certificate- Pilot Credit: Social Equity Within the Project Team

NC-v4 INc1: Innovation
posted by Alison Rosso on Aug 8, 2023, 7:39 pm

of the design team" of this Pilot credit and will submit our JUST label for a LEED v4 ID+C Project. The credit requires the following: 1. Pilot credit registration 2. LEEDuser forum participation 3. Pilot...

Last reply: Douglas Flandro, Mar 22, 2024, 10:31 am