Log in
Forum
Topic

Campus Approach

NC-v4 MRc5: Construction and demolition waste management
posted by Ricardo Sá on Sep 14, 2020, 5:06 am

Afogreen Build Green Building Consultant Afogreen Build Pte Ltd LEEDuser Premium Member September 16, 2020- 5:25 pm Dear Ricardo, If the question is directed to GBCI, you may try LEED Interpretation, through which GBCI will answer your specific question. In LEED User forum, fellow professionals will give you answer based on best knowledge.  Yes, need monitoring and reporting individually for MR Construction and Demolition Waste Management Credit. Perhaps you can consider putting requirement for the contractor to group the waste in separate bins for each building.  Log in or register to post comments ...

Last reply: Afogreen Build, Sep 16, 2020, 5:25 pm

Template forms not working v4

Living with LEED Online - quirks, bugs and hiccups
posted by Karyn Rodrigues on Sep 16, 2020, 5:35 am

Since yesterday I am having problems accessing template forms from all computers in my office, they just don't open at all, despite having tried from different browsers (chrome, safari, internet...

Last reply: David Posada, Sep 16, 2020, 2:00 pm

v4.1 Low-Emitting Calculator??

NC-v4.1 EQc2: Low-emitting materials
posted by Sara Greenwood on Jun 21, 2019, 5:34 pm

Does anyone have access to a v4.1 low-emitting calculator? Since some categories are now quantified by cost, volume, or square footage it warrants a different calculator.

Last reply: Keith Robertson, Sep 16, 2020, 1:30 pm

Internet Explorer and Adobe DC Reader

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Jason Sturniolo on Sep 9, 2020, 8:47 am

https://leeduser.buildinggreen.com/forum/leed-online-usgbcorg-site-are-d... Log in or register to post comments ...

Last reply: Alara Matsyk, Sep 16, 2020, 10:38 am

Entryway Systems for Building without Exterior Entrance

Healthcare-v2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Blair Benson on Sep 16, 2020, 10:01 am

Hello,

Is there currently any guidance for acheiving the Entryway Systems section of IEQc5 for buildings that do not have an exterior building entrance? Our project is a new hospital...

Recommened software for doing the Interior and Daylighting analyses.

NC-v4 EQc7: Daylight
posted by Jorng-ren Chern on Apr 10, 2018, 2:05 am

requirements for defining glazing visible transmittance (TVis) than documented for prior versions of Insight Lighting in the Forum.  Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian...

Last reply: Wendy Sun, Sep 15, 2020, 9:09 pm

Radon resistant construction for first 4 stories above grade.

NC-v4 EQp1: Minimum indoor air quality performance
posted by Sue Bryant on Sep 15, 2020, 8:09 pm

  • Requirement: Construct any dwelling unit on levels one through four above grade with radon-resistant construction techniques. Follow the techniques prescribed in EPA Building Radon Out;...

Working through COVID-19

Working through COVID-19
posted by Paula Melton on Apr 9, 2020, 3:00 pm

Are you having trouble working from home? Worried about your submittals going in on time? Concerned that you can't conduct a charrette?

Welcome to our COVID-19 discussion forum. Feel free...

Last reply: Ava Morgan, Sep 15, 2020, 6:13 pm

Pilot Credit req's and a suggestion

Pilot-Credits SSpc55: Bird collision deterrence
posted by emily reese moody on Jul 6, 2020, 5:03 pm

Most of the posts on these Pilot Credit pages are here out of necessity to submit it for review, this one included. It would be nice if there were some way to differentiate/filter between posts...

Last reply: Austin McCanless, Sep 15, 2020, 2:09 pm

Non-electric and electric energy use for the Renewable Energy credit version 4.1

CI-v4.1 EAc4: Renewable energy
posted by Ana Maria Escobar Cardenas on Jul 22, 2020, 9:16 am

Hello! 

I am doing a substitution of the Renewable Energy (Green Power) credit to version 4.1 for a Commercial Interior project. 
I used TABLE 2....

Last reply: Boone Jones, Sep 15, 2020, 1:24 pm