Topic | Recent |
---|---|
TSS removal efficiency % table?NC-2009 SSc6.2: Stormwater design - quality controlposted by Kash Boodjeh on Jul 19, 2011, 5:48 pm
What is the best resource for finding... Last reply: Michael DeVuono, Mar 3, 2012, 9:17 am |
|
Quick clarificationEBOM-2009 SSc4: Alternative Commuting Transportationposted by Wendy Gibson on Oct 8, 2010, 11:29 am
I understand that a compressed work weeks count toward SSc4. What about schedules that falll outside "rush hours" such as a 10am - 7pm shift, or a 7pm - 10am shift? I dont think it would count,... Last reply: Dan Ackerstein, Mar 2, 2012, 8:47 pm |
|
Core & Shell M&VCS-2009 EAc5.1: Measurement and verification - base buildingposted by Randy Cook on Mar 2, 2012, 2:50 pm
Hello, I have read thru the previous posts and responses, and hope this is not a redundant question. I am working on a C&S major renovation. We are going to follow Option B from... Last reply: Marcus Sheffer, Mar 2, 2012, 5:13 pm |
|
Scope of comissioningEBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioningposted by Iris Amdur on Apr 27, 2011, 3:25 pm
Hello- We're working on a building that is not owner occupied and the tenant has 48 additional pieces of equipment that are not a part of the... Last reply: Jacob Arlein, Mar 2, 2012, 3:51 pm |
|
Design or Construction Credit?Pilot-Credits EQpc24: Acousticsposted by Orlin Velinov, PE on Mar 2, 2012, 12:43 pm
Is this s design or construction credit? From the credit form requirements looks like the NC levels will have to be measured, the rest criteria can be theoretically analysed or modeled. We are at... Last reply: Nicholas Block, Mar 2, 2012, 2:45 pm |
|
Parking Capacity overflow to Gravel LotNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Eduardo Guzman on Jan 24, 2012, 1:00 pm
We have a research building that shares an asphalt parking lot with a warehouse (used by the researchers but not being certified). We have limited our parking capacity to 25% fewer that the ITE... Last reply: Eduardo Guzman, Mar 2, 2012, 12:46 pm |
|
Specifications for GC regarding MR CreditsNC-2009 MRc2: Construction Waste Managementposted by Jim Pugh on Mar 1, 2012, 3:18 pm
We are about to start our 2nd LEED project and are interested in providing wording within the Specifications for the General Contractors bidding the project preparing them for the required... Last reply: RETIRED, Mar 2, 2012, 12:37 pm |
|
Speech privacyPilot-Credits EQpc24: Acousticsposted by James Chueh on Jan 9, 2012, 4:50 am
Hi all, Last reply: Orlin Velinov, PE, Mar 2, 2012, 11:42 am |
|
Filter PerformanceEBOM-2009 IEQc1.4: Indoor air quality best management practices - reduce particulates in air distributionposted by Alexa Stone on Aug 9, 2011, 1:18 pm
Has anyone ever had an issue with... Last reply: Hannah Bronfman, Mar 2, 2012, 11:32 am |
|
Baseline in LEED reference guide and IPMVPNC-2009 EAc5: Measurement and Verificationposted by Karoline Geneser on Mar 2, 2012, 1:49 am
Considering EAc5, both LEED Reference Guide and... Last reply: Marcus Sheffer, Mar 2, 2012, 9:11 am |