Log in
Forum » Credit Forums
Topic

All indoor water is outside of project owner scope

CS-2009 WEp1: Water Use Reduction
posted by Mary Frances Stotler on Mar 23, 2012, 8:49 am

I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out. There are no public restrooms in...

Last reply: Curt Pascoe, Mar 23, 2012, 12:23 pm

Window to wall ratio

NC-2009 EAp2: Minimum Energy Performance
posted by Katherine Ann Resurreccion on Mar 23, 2012, 3:52 am

I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated. There are small driver’s lounges in the garage building...

Last reply: Marcus Sheffer, Mar 23, 2012, 8:53 am

"Non-Structural" material/Interior walls

Pilot-Credits MRpc52: Material multi-attribute assessment
posted by stephanie fagan on Mar 22, 2012, 6:57 pm

Would metal framed interior walls need to be excluded from the calculations for this pilot credit?

Last reply: Keith Lindemulder, Mar 23, 2012, 8:52 am

PC13 Closed?

Pilot-Credits PC13: Bicycle Network, Storage, and Changing Rooms
posted by Becky Dix on Mar 22, 2012, 4:23 pm

I was hoping to take part in this pilot credit and see that it has closed. Is it possible to submit similar documentation for an ID credit?

Last reply: Samantha Harrell, Mar 22, 2012, 7:38 pm

Secure bicycle racks and secure bicycle storage

CS-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Caroline Ma on Feb 22, 2012, 6:10 am

Any difference between Secure bicycle racks and secure bicycle storage?
In CS project with area larger that 300,000 sq.ft. (CS case 2), we need to provide secure bicycle storage. Can we...

Last reply: David Posada, Mar 22, 2012, 6:52 pm

Wine Coolers

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Sheela I on Mar 22, 2012, 4:43 pm

Do wine coolers qualify for Energy Star?

Last reply: Samantha Harrell, Mar 22, 2012, 6:34 pm

No Engineer on Project

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on Dec 13, 2011, 3:24 pm

All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature?

Last reply: Rob Hink, Mar 22, 2012, 10:49 am

Steel Joists & Deck

NC-2009 MRc5: Regional Materials
posted by Jeremy Hatfield on Sep 16, 2011, 1:36 pm

I am a bit confused when it comes to Steel Joist and Deck. New Millennium and Vulcraft obtain steel from mills. Does the steel mill serve as their extraction/recovery origin or do we have to...

Last reply: Keith Lindemulder, Mar 22, 2012, 9:44 am

Stated Cost

NC-2009 MRc5: Regional Materials
posted by matthew convery on Mar 5, 2012, 6:04 pm

When calculating both the regional material and...

Last reply: Keith Lindemulder, Mar 22, 2012, 9:41 am

Regional Materials- Mileage Info

NC-2009 MRc5: Regional Materials
posted by Mike Maas on Mar 20, 2012, 1:49 pm

What should be done for a product that has numerous locations for extraction. For instance, my steel supplier has 47% regional materials, but the sources are from about a dozen different mills...

Last reply: Keith Lindemulder, Mar 22, 2012, 9:38 am