Topic | Recent |
---|---|
All indoor water is outside of project owner scopeCS-2009 WEp1: Water Use Reductionposted by Mary Frances Stotler on Mar 23, 2012, 8:49 am
I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out. There are no public restrooms in... Last reply: Curt Pascoe, Mar 23, 2012, 12:23 pm |
|
Window to wall ratioNC-2009 EAp2: Minimum Energy Performanceposted by Katherine Ann Resurreccion on Mar 23, 2012, 3:52 am
I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated. There are small driver’s lounges in the garage building... Last reply: Marcus Sheffer, Mar 23, 2012, 8:53 am |
|
"Non-Structural" material/Interior wallsPilot-Credits MRpc52: Material multi-attribute assessmentposted by stephanie fagan on Mar 22, 2012, 6:57 pm
Would metal framed interior walls need to be excluded from the calculations for this pilot credit? Last reply: Keith Lindemulder, Mar 23, 2012, 8:52 am |
|
PC13 Closed?Pilot-Credits PC13: Bicycle Network, Storage, and Changing Roomsposted by Becky Dix on Mar 22, 2012, 4:23 pm
I was hoping to take part in this pilot credit and see that it has closed. Is it possible to submit similar documentation for an ID credit? Last reply: Samantha Harrell, Mar 22, 2012, 7:38 pm |
|
Secure bicycle racks and secure bicycle storageCS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Caroline Ma on Feb 22, 2012, 6:10 am
Any difference between Secure bicycle racks and secure bicycle storage? Last reply: David Posada, Mar 22, 2012, 6:52 pm |
|
Wine CoolersCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Sheela I on Mar 22, 2012, 4:43 pm
Do wine coolers qualify for Energy Star? Last reply: Samantha Harrell, Mar 22, 2012, 6:34 pm |
|
No Engineer on ProjectCI-2009 IEQp1: Minimum indoor air quality performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on Dec 13, 2011, 3:24 pm
All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature? Last reply: Rob Hink, Mar 22, 2012, 10:49 am |
|
Steel Joists & DeckNC-2009 MRc5: Regional Materialsposted by Jeremy Hatfield on Sep 16, 2011, 1:36 pm
I am a bit confused when it comes to Steel Joist and Deck. New Millennium and Vulcraft obtain steel from mills. Does the steel mill serve as their extraction/recovery origin or do we have to... Last reply: Keith Lindemulder, Mar 22, 2012, 9:44 am |
|
Stated CostNC-2009 MRc5: Regional Materialsposted by matthew convery on Mar 5, 2012, 6:04 pm
When calculating both the regional material and... Last reply: Keith Lindemulder, Mar 22, 2012, 9:41 am |
|
Regional Materials- Mileage InfoNC-2009 MRc5: Regional Materialsposted by Mike Maas on Mar 20, 2012, 1:49 pm
What should be done for a product that has numerous locations for extraction. For instance, my steel supplier has 47% regional materials, but the sources are from about a dozen different mills... Last reply: Keith Lindemulder, Mar 22, 2012, 9:38 am |