Log in
Forum » Credit Forums
Topic

Commissioning of Systems not required in prereq

NC-2009 EAc3: Enhanced Commissioning
posted by Shauna Sproul on Mar 14, 2012, 10:54 am

Can points be achieved in innovation and design for...

Last reply: Chris Ladner, Mar 23, 2012, 5:16 pm

CxA designation question

NC-2009 EAc3: Enhanced Commissioning
posted by Blas Beristain on Feb 3, 2012, 7:47 am

Hello!

We are involved in a project of a new headquarters of an architectural firm.

In this project, the owner will be the architectural firm. Of course, the design team will be...

Last reply: Scott Bowman, Mar 23, 2012, 4:57 pm

CxA Contract Question

NC-2009 EAc3: Enhanced Commissioning
posted by Mark Haynie on Mar 8, 2012, 4:09 pm

We hold a contract for construction of a project as the General Contractor. We also have contracted with the design firm (Architect) for the project. Since we hold the contract and are the...

Last reply: Scott Bowman, Mar 23, 2012, 4:52 pm

Walkable Streets- Historic

Pilot-Credits PC14: Walkable Streets
posted by Pat Thomas on Mar 22, 2012, 12:56 pm

Our project is an adaptive...

Last reply: Nicholas Harrell, Mar 23, 2012, 4:21 pm

Round-up

EBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
posted by SIG - Sustainability Main Account on Aug 25, 2011, 1:02 pm

I'd like to confirm that Round-Up Pro (EPA # 524-475) is okay to use for weed control in sidewalk cracks. The only reference to weeds I can find is that the best practice is to hand-pull-is that...

Last reply: SIG - Sustainability Main Account, Mar 23, 2012, 4:17 pm

'installed by substantial completion of construction'

Schools-2009 EAc2: On-Site Renewable Energy
posted by Sara Goenner Curlee on Mar 23, 2012, 12:05 pm

The letter template has a sign-off for the owner/agent to declare that the...

Last reply: Marcus Sheffer, Mar 23, 2012, 12:46 pm

All indoor water is outside of project owner scope

CS-2009 WEp1: Water Use Reduction
posted by Mary Frances Stotler on Mar 23, 2012, 8:49 am

I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out. There are no public restrooms in...

Last reply: Curt Pascoe, Mar 23, 2012, 12:23 pm

Window to wall ratio

NC-2009 EAp2: Minimum Energy Performance
posted by Katherine Ann Resurreccion on Mar 23, 2012, 3:52 am

I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated. There are small driver’s lounges in the garage building...

Last reply: Marcus Sheffer, Mar 23, 2012, 8:53 am

"Non-Structural" material/Interior walls

Pilot-Credits MRpc52: Material multi-attribute assessment
posted by stephanie fagan on Mar 22, 2012, 6:57 pm

Would metal framed interior walls need to be excluded from the calculations for this pilot credit?

Last reply: Keith Lindemulder, Mar 23, 2012, 8:52 am

PC13 Closed?

Pilot-Credits PC13: Bicycle Network, Storage, and Changing Rooms
posted by Becky Dix on Mar 22, 2012, 4:23 pm

I was hoping to take part in this pilot credit and see that it has closed. Is it possible to submit similar documentation for an ID credit?

Last reply: Samantha Harrell, Mar 22, 2012, 7:38 pm