Log in
Forum » Europe – Western
Loading...
Topic

Coffee Room Fixture Flow Rate?

NC-2009 WEp1: Water Use Reduction
posted by Ian McCall on May 13, 2015, 5:31 am

Hello,
From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
What is the baseline flow rate...

Last reply: Charles Nepps, May 13, 2015, 6:19 am

Minimum exhaust Rates

CS-2009 IEQp1: Minimum IAQ Performance
posted by Elodie DUMAS on Jan 28, 2015, 6:20 am

Dear all,
We work on a private office building where toilet facilities are composed of several individual toilet rooms.
Reading the ASHRAE 62.1, we are not sure about the occupancy...

Last reply: David Hubka, May 12, 2015, 1:00 pm

Green roof eligibility

NC-v4 WEc1: Outdoor water use reduction
posted by Davis Kantor on Nov 6, 2014, 7:57 pm

Is a non-irrigated vegetated roof included in this credit calculation? It seems obvious that an accessible green roof would be. How about a non-accessible green roof?

Last reply: Trista Little, May 1, 2015, 6:20 pm

Non occupied spaces

NC-v4 EQc2: Low emitting materials
posted by Caroline PIN on Apr 30, 2015, 3:11 am

Hello,
Is nonoccupied spaces are affected by this credit ?
Definition of non occupied spaces : spaces designed for equipment and machinery or storage with no human occupancy except...

Last reply: Michelle Halle Stern, Apr 30, 2015, 8:46 am

EAP2 case 1 for international projects

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Elodie DUMAS on Apr 28, 2015, 2:46 pm

I have a question about the following statement from above :
"We have an international project and the space type is eligible for an Energy Star rating. Can we pursue Case 1 to demonstrate...

Last reply: Eric Johnson, Apr 28, 2015, 2:59 pm

Tenants Obliged to Share Data with USGBC?

CS-2009 EAc5.2: Measurement and Verification—Tenant Submetering
posted by Ian McCall on Apr 17, 2015, 10:53 am

Hello All,

Are tenants obliged to share their energy data with USGBC for any period of time?

Having the necessary number and level of tenant sub-meters is not a problem (as the...

Last reply: Marcus Sheffer, Apr 20, 2015, 10:38 am

District Cooling

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Mark Daub on Mar 30, 2015, 11:23 am

as not having any refrigerants? If you haven't already, I would recommend posting in the Enhanced Commissioning credit forum for advice on commissioning upstream equipment, as lots of people have shared...

Last reply: Melissa Kelly, Apr 17, 2015, 11:41 am

Wood wallbase

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Devani PERERA on Apr 13, 2015, 11:01 am

Has anyone seen a floorscore for...

Last reply: John-David Hutchison, LEED AP BD+C, PMP, Apr 14, 2015, 10:37 am

EAp2:Table 1.4 based on ASHRAE 90.1-2010

CS-v4 EAp2: Minimum Energy Performance
posted by CHRISTOPHE MATHIEU on Mar 3, 2015, 10:12 am

Hi all,

I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website.

I have read that I can present the table 1.4 based on 90.1...

Last reply: Marcus Sheffer, Apr 14, 2015, 9:47 am

Number of sampling location

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Caroline PIN on Feb 11, 2015, 12:17 pm

Dear all,
Does anyone know if there is an ACP rule for sampling points for the air quality tests. I didn't find an ACP in LEED 2009 BD+C Supplemental Reference Guide with Alternative...

Last reply: Tristan Roberts, Mar 19, 2015, 6:49 pm