Log in
Forum » LEED Rating System Selection
Topic

Advantages of v4 Schools over NC

LEED Rating System Selection
posted by GBD Architects on Feb 2, 2017, 2:15 pm

Hi all,
We are analyzing a project that is on a higher ed campus but serves pre-K students. While it doesn't fit the K-12 guidance, we do feel we could make a compelling argument for using...

Last reply: Tristan Roberts, Feb 3, 2017, 1:43 pm

Residential Core & Shell

LEED Rating System Selection
posted by soha yamani on Oct 23, 2016, 9:52 am

Hello all

I am working on a project that consists of 12 residential buildings with 3 prototypes

each prototype has 4 identical residential buildings ( 5 stories each)

however...

Last reply: Tristan Roberts, Feb 2, 2017, 10:30 am

Major Renovation scope of work

LEED Rating System Selection
posted by Vanessa Poirier on Jan 30, 2017, 3:42 pm

Hi,
We are starting a study to verify if a specific renovation project could achieve a LEED V4 BD+C certification. What is the scope of work required to qualify as 'Major Renovation'. Is...

Last reply: David Posada, Feb 1, 2017, 1:14 pm

Leed v4 Core & Shell // Future fit-out by the owner

LEED Rating System Selection
posted by Louis Haag on Jan 18, 2017, 6:02 am

Hi,

We have a warehouse project for which the Core&Shell will be built in a first time, and the owner will perform the fit-out himself a few years later.

The question is can we...

Last reply: Nadav Malin, Jan 31, 2017, 11:50 am

Major Renovation prerequisites

LEED Rating System Selection
posted by Vanessa Poirier on Jan 30, 2017, 3:56 pm

Hi all,

In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project. Example : if we...

Last reply: Nadav Malin, Jan 31, 2017, 11:40 am

High-rise Residences: NC or C&S?

LEED Rating System Selection
posted by Maria Isabel Conde on Aug 17, 2016, 12:35 pm

Hello,

We have a project that wants to pursue LEED v2009 certification. The building is mixed-use but mostly residential (2 levels will be for commercial use, 4 levels for office and...

Last reply: Tristan Roberts, Jan 15, 2017, 4:41 pm

Rating System Selection

LEED Rating System Selection
posted by Francis McNulty on Dec 7, 2016, 11:17 am

Hi, I have a project that is currently undergoing LEED certification for NC Major Renovation, with the certification due in the next two months. The project is now currently in the process of...

Last reply: Tristan Roberts, Jan 15, 2017, 2:22 pm

CI minimum scope of work?

LEED Rating System Selection
posted by Michael Smithing on Oct 28, 2016, 3:23 am

Is there a minimum scope of work to certify a project under LEED CI? I somehow remember a requirement that at least one room be unavailable for regular use for a minimum period of time (1 day?)...

Last reply: Tristan Roberts, Jan 15, 2017, 2:19 pm

Can LEED for New Construction be used for Ronald McDonald House

LEED Rating System Selection
posted by cathy keagle on Sep 1, 2016, 11:40 am

Our client is going to construct a two story Ronald McDonald House. The community where it where be built is zoned for Commercial MultiFamily Housing. The meter will be a commercial meter for...

Last reply: Tristan Roberts, Jan 15, 2017, 1:42 pm

Mixed Use Residential plus hotel V4 Version?

LEED Rating System Selection
posted by Beth Mosall on Oct 11, 2016, 12:40 pm

Project is on an urban site, 1.5 acres, brownfield, will be fully built out with a 2 level parking deck with retail on two sides, on top of which 3 buildings and a terrace garden will be built. 2...

Last reply: Beth Mosall, Oct 11, 2016, 2:44 pm