posted by Catherine Verdier on Jan 29, 2015, 9:22 am

Hello,

The project I am working on is an existing office building, that will undergo renovation works and will have its entrance hall extended (the extension will be a little more than 1,...

Last reply: David Hubka, Jan 29, 2015, 5:37 pm

What Rating System to use

LEED Rating System Selection
posted by Carlos Leignadier on Jan 21, 2015, 12:26 pm

Hi,
We are currently working on certifying a mall with the Core and Shell V2009 rating system. Inside this mall a supermarket will be located, and the client is asking if the supermarket...

Last reply: Lauren Wallace, Jan 21, 2015, 12:34 pm

Best way to document a building with multiple phases

LEED Rating System Selection
posted by Mike Stopka on Jan 7, 2015, 1:20 pm

Hello

I am currently working on a mixed-use campus project. This project will only be 1 building, however construction will be done in two phases. All the design work has already been...

Last reply: Mike Stopka, Jan 7, 2015, 3:32 pm

LEED EBOM

LEED Rating System Selection
posted by Srimannarayana NCVK on Nov 13, 2014, 12:10 am

Hi,

We are working on a project in Dubai.
The building is 55% office and 45% hotel.
There is no floor level metering and the building has only one electricity meter.

I...

Last reply: David Eldridge, Dec 7, 2014, 5:37 pm

Existing Dining Facility Building v3 rating system

LEED Rating System Selection
posted by Emily Wang on Nov 6, 2014, 8:14 pm

I'm working on an existing Dining facility which has a significant amount of interior renovations and a small amount of NC, and exterior. The current building is not being used, nor being...

Last reply: David Eldridge, Dec 7, 2014, 5:11 pm

LEED CS with partially occupied building

LEED Rating System Selection
posted by alessandro speccher on Apr 18, 2014, 9:48 am

hello everybody,
this is my first post on leeduser and I want to start giving compliments to everybody are sharing so lot of knoweledge;
returning to building, a design team described...

Last reply: Emmanuel Pauwels, Nov 5, 2014, 7:58 am

NC 2009 or v4 Multifamily Midrise

LEED Rating System Selection
posted by Timothy Schmitt on Sep 11, 2014, 4:27 pm

Hi,
I'm working on a mid-rise residential development that includes residential units & parking. There are two adjoined buildings. Six floors above grade w/ one below (lower level...

Last reply: Emmanuel Pauwels, Nov 5, 2014, 6:49 am

LEED Dynamic Plaque--any thoughts and experiences to share?

LEED Rating System Selection
posted by ACE Bermuda on Aug 26, 2014, 1:56 pm

Hi all,
I'm curious to know if anyone has had experiences with installing and maintaining the Dynamic Plaque. Empirical opinions on the ease, or difficulty, of use would be appreciated....

Last reply: Barry Giles, Sep 2, 2014, 11:53 am

Unleased areas in New Construction

LEED Rating System Selection
posted by Jan Hesse on Jun 20, 2014, 4:50 pm

Tristan Roberts Technical Director The Laurentia Project, HPDC LEEDuser Expert 11456 thumbs up July 26, 2014- 1:33 am Jan, these would be good questions to post to the specific LEEDuser forums on our site, such as IEQc6.1. Log in or register to post comments Kristina Bach Sustainability Specialist HGA Architects and Engineers LEEDuser Basic Member 149 thumbs up August 27, 2014- 11:19 am Jan- You probably also need to take a look at LEED Interpretation 10102 which sets additional requirements for NC projects which have incomplete spaces (I assume that 20% would not be complete). This is based...

Last reply: Kristina Bach, Aug 27, 2014, 11:19 am

Can a residential project be certified under LEED CS?

LEED Rating System Selection
posted by Agata Mozer on Apr 30, 2014, 9:12 am

I would like to ask if a residential building of 4 or more storeys can be certified under LEED 2009 for Core and Shell system?
I read that residential buildings can be certified under LEED...

Last reply: Markus Henning, Aug 27, 2014, 7:06 am