Log in
Forum » Europe – Western
Loading...
Topic

indoor smoking room exhaust

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Nicole Isk on Jun 24, 2015, 8:58 am

Hi, an occupant in our project building (office) insists on indoor smoking.
He agreed to installing a cabin in his kitchenette (they already smoke there). The cabin is able to comply with...

Last reply: Ben Stanley, Jul 7, 2015, 6:02 pm

Development Density Calculations

CS-2009 SSc2: Development Density and Community Connectivity
posted by Amanda Johnson on Jun 15, 2015, 5:37 am

For the Development Density calculations our project has an 880 ft DD radius . Are the buildings that are intersected by the Development Density Radius counted completely withing the...

Last reply: Karin Miller, Jun 29, 2015, 4:47 pm

Waste management pro-rate surface logic for two buildings

CS-2009 MRc2: Construction Waste Management
posted by Ian McCall on Jun 16, 2015, 11:48 am

#10265 and prorate by square footage. Either way, this should be a simple calculation at the end of the job and will not affect logistics on the job site. See also our discussion on NC Forum...

Last reply: Ian McCall, Jun 17, 2015, 12:39 pm

All or the Main street frontages 1:1.5

Pilot-Credits PC14: Walkable Streets
posted by Ian McCall on Jun 15, 2015, 7:58 am

Dear All,

The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”. I have a new building in a very dense city (...

Zero-lot line project- LEED requirements

CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Mark Frey on Jun 11, 2015, 11:00 am

Hello,
our project is located directly along a public sidewalk. There are several retail tenants in the project. The building owner doesn’t want to force the tenants to prohibit smoking...

Chemical Anchorage Pins

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Amanda Johnson on Feb 6, 2015, 4:34 am

Hi are Chemical Anchorage Pins for structural concrete walls included in the scope of this credit? I am guessing not but want to check....

Last reply: Lawrence Lile, Jun 9, 2015, 11:10 pm

20 or More Basic Services- Innovation Credit?

CS-2009 SSc2: Development Density and Community Connectivity
posted by Ian McCall on Jun 4, 2015, 5:55 am

Hello,

Is it possible to get an innovation credit for projects that have 20 or more basic services (that are different)?

Regards,
Ian

Last reply: Ali Soufan, Jun 4, 2015, 7:44 am

Confirmation- perforated sticker sign

CI-2009 IEQc8.1: Daylight and views - daylight
posted by Ian McCall on Jun 3, 2015, 12:06 pm

Hello,
Can someone confirm that an temporary (3 months) publicity perforated window decal installed by the future tenant on the glazed facade is out of the scope of the LEED NC or CS...

Last reply: TODD REED, Jun 3, 2015, 1:49 pm

satisfaction surveys- Ergonomics strategy

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Jean-Baptiste SARFATI on May 21, 2015, 6:29 am

Are there standardized satisfaction surveys for ergonomics workstations in a store ?
We would like to evaluate METWAs, furnishings, and accessories to ensure they continue to meet the...

Coffee Room Fixture Flow Rate?

NC-2009 WEp1: Water Use Reduction
posted by Ian McCall on May 13, 2015, 5:31 am

Hello,
From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
What is the baseline flow rate...

Last reply: Charles Nepps, May 13, 2015, 6:19 am