Is Zoysia japonica turf?NC-v4 WEp1: Outdoor water use reductionposted by Linh Dang on Dec 23, 2022, 6:17 am
Dear all LEED user expert We use Zoysia japonica for landscape. now we dont know is Zoysia turf or groundcover? if it is turf , how can i approve that is groundcover? Thanks... Last reply: Afogreen Build, Mar 25, 2024, 9:13 pm |
|
No Cooling Tower ACP FeedbackPilot-Credits WEpc94: No Cooling Towerposted by on Mar 25, 2024, 4:02 pm
I found this pilot credit to be a great way to allow projects to earn credit for the design choice of choosing not to utilize cooling towers on the project even for buildings that are large... |
|
Commercial Kitchen QueryCI-v4 EAp2: Minimum Energy Performanceposted by padma priya on Mar 7, 2024, 6:30 am
In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. Last reply: Marcus Sheffer, Mar 25, 2024, 9:48 am |
|
Industrial Process Loads and the Exceptional Calulation MethodNC-2009 EAc1: Optimize Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Apr 16, 2014, 4:22 pm
We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use. Therefore, even if the non-process building portion was Net Zero Energy, we would not... Last reply: Farooq Saeed, Mar 25, 2024, 1:39 am |
|
Modeling only conditioned areaNC-v4 EAp2: Minimum Energy Performanceposted by Omar Elrawy on Dec 9, 2020, 10:05 pm
I'm certifying a huge factory with an attached office building. Is it possible to model only the office area? Last reply: Farooq Saeed, Mar 25, 2024, 1:38 am |
|
What if Question- Bathroom removed from scope, how to comply with WEp1?CI-v4 WEp1: Indoor water use reductionposted by Edgar Arevalo on Mar 21, 2024, 2:57 pm
How would a project comply with WEp1 if the bathroom was removed from scope. This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of... Last reply: Edgar Arevalo, Mar 22, 2024, 4:20 pm |
|
Walk off mats for skyway entranceNC-v4 EQc1: Enhanced indoor air quality strategiesposted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm
Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "... Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm |
|
Storage locationNC-v4 MRp1: Storage and Collection of Recyclablesposted by Maiz Rech on Sep 11, 2023, 1:33 pm
Is there a minimum distance or positioning requirement for this area? Would it be a problem to locate the recyclables storage on the building underground floor? Last reply: Thomas Lagarde, Mar 22, 2024, 2:28 pm |
|
Buildings within site but not under LEED scopeNC-v4 EQp2: Environmental tobacco smoke controlposted by Marwa Elzoghby on Mar 22, 2024, 10:44 am
I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to... |
|
JUST Certificate- Pilot Credit: Social Equity Within the Project TeamNC-v4 INc1: Innovationposted by Alison Rosso on Aug 8, 2023, 7:39 pmof the design team" of this Pilot credit and will submit our JUST label for a LEED v4 ID+C Project. The credit requires the following: 1. Pilot credit registration 2. LEEDuser forum participation 3. Pilot... Last reply: Douglas Flandro, Mar 22, 2024, 10:31 am |