Log in
Forum
Loading...
Topic

How to calculate with Free-addess

CI-v4.1 LTc4: Bicycle facilities
posted by Carina Clark on May 13, 2019, 3:55 pm

With the popularity of "free-address" how do we complete calculations like this for Regular Building Occupants? Do we need to use the number of seats, or, the actual number of employees (many,...

Last reply: David Hubka, May 14, 2019, 2:28 pm

Pilot Credit EApc95- LEED v2010 MF Midrise

Pilot-Credits EApc95: Alternative Energy Performance Metric
posted by Thomas Chase on May 14, 2019, 10:22 am

We have an MF Midrise project located in Boston, with all-electric VRF systems as a result of advocacy by the City of Boston to electrify buildings.  With low natural gas cost per...

Main entrance- Parking entrance

NC-v4 LTc4: Surrounding density and diverse uses
posted by Maria J Maroño on Apr 27, 2019, 10:38 am

The main entrance of my project is the parking entrance. Should I measure the...

Last reply: Kara Strong, May 14, 2019, 10:27 am

Energy Model Approach- Central Plant serving the Project Space

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Amal Venugopal on May 14, 2019, 6:30 am

Dear All,

I am doing the Energy Model for one of CI Project considering the ASHRAE 90.1.2007 Appendix G - Performance rating method. ...

Aerobic Digester for a LEED credit?

NC-v4 INc1: Innovation
posted by Harry Flamm on Jan 31, 2018, 3:32 pm

On a university residential/dining hall project, we will be utilizing an "Eco-Digester", (an aerobic digester from BioHiTech), http://...

Last reply: Han Qiang Ler, May 14, 2019, 1:37 am

Gender neutral restrooms

NC-v4 WEp2: Indoor water use reduction
posted by Anna Kaelin on May 9, 2019, 4:25 pm

My project only has two water closets, one is back-of-house for employees only and one is for customers. Both are gender neutral. Because the calculator requires you categorize WC's by gender I...

Last reply: emily reese moody, May 14, 2019, 1:00 am

No parking for the project

CI-v4 LTc5: Reduced parking footprint
posted by Ricardo Sá on Jan 9, 2017, 7:30 am

I understand that LEED v4 CI specifically states that "if there is existing parking associated with the project, it must comply with the requirements of the credit and show a percentage reduction...

Last reply: emily reese moody, May 14, 2019, 12:51 am

LEED turf

NC-v4 SSc3: Open space
posted by chloe lamontagne-girard on Jan 8, 2018, 11:28 am

Does LEED turf count as vegetation in the 25 % minimum vegetation of outdoor space?

Last reply: Chelsea M, May 13, 2019, 5:25 pm

Confidential client

CI-v4.1 MRc1: Long-term commitment
posted by Carina Clark on May 13, 2019, 3:40 pm

How has a team met this credit if the client is confidential?

Meeting Option 2 Requirements

CI-v4 EAc3: Advanced Energy Metering
posted by Bonny Gray on May 11, 2019, 5:28 pm

Below are the construction review comments from our reviewer:

Option 2:  Advanced Metering

  1. It is unclear if the Table:  Advanced Meters includes all individual energy end-uses...

Last reply: Bonny Gray, May 13, 2019, 11:50 am