Topic | Recent |
---|---|
How many units needed for air testing.Mid-Rise-v4 EQc2: Contaminant controlposted by Jillian Hansen on Aug 10, 2020, 4:00 pm
I am working on a project that has one ventilation system and each of the 6 floors are less than 25,000SF. Going by the reference guide there are three options for number of units needed to be... |
|
SSc4 Surveying Staff Throughout BuildingEBOM-2009 SSc4: Alternative Commuting Transportationposted by Alexis Doyle on Aug 9, 2019, 12:55 pm
Hello, We are looking to complete an alternative commuting survey at a building owner and the property owner has suggested that we tour the building, visiting each office and survey people... Last reply: Patrick Murisset, Jun 16, 2020, 2:40 pm |
|
Management Plan Addressing How Pollution and Eutrophication of Waterways Would Be Minimized through Operational ChangesNC-2009 SSc6.2: Stormwater design - quality controlposted by Sandra Lester on Jun 8, 2020, 7:59 am
We have been asked by the CaGBC to provide a management plan addressing how pollution and eutrophication of waterways would be minimized through operational changes. As required in the LEED... |
|
Insulation calculation by surface areaNC-v4.1 EQc2: Low-emitting materialsposted by Marie-Christine Morin on Apr 24, 2020, 8:24 am
Hi all, The guide says that at least 75% of all insulation, by cost or surface area, meets the... Last reply: Deborah Lucking, Jun 7, 2020, 4:19 pm |
|
Shared Parking Spaces and Existing EV Charging Stations on University CampusNC-v4 LTc8: Green vehiclesposted by Ashley Hu on Jul 27, 2018, 3:05 pm
Hi everyone, We have a student housing project that is located within a university campus which has shared parking with the rest of the campus. There are some existing EV charging stations... Last reply: Jasmin Rajak, May 23, 2020, 5:06 am |
|
Borrowing credit from Homes Design and CronstructionNC-v4 EAc5: Renewable energy productionposted by Michael J Turner on May 5, 2020, 4:47 pm
Hello, We are using LEED V4 BD+C, and we achived a credit listed within the LEED Homes Design and Construction; specifically the EA Credit: Active Solar-Ready Design. Can we use... Last reply: Marcus Sheffer, May 18, 2020, 10:26 am |
|
Controller efficiency no longer available to demonstrate irrigation water use reductions?CS-v4 WEc1: Outdoor water use reductionposted by Jason Packer on Apr 15, 2020, 12:21 pm
Hi all it seems that controller efficiency (CE) no longer is allowed to be used in calculating design irrigation water use in V4/4.1 for this credit. Is that your understanding? If I'm... Last reply: Allen Cornett, May 4, 2020, 5:34 pm |
|
Appendix 2: Default Occupancy CountsLEED v4.1 Discussion Forumposted by Elizabeth Hand on Apr 22, 2020, 1:11 pm
I am working on a Community Center that has been registered for LEED BD+C NC. The occupancy estimate of our project is currently unknown, and I am unable to reference a default occupancy count ... |
|
LEED turfNC-v4 SSc3: Open spaceposted by chloe lamontagne-girard on Jan 8, 2018, 11:28 am
Does LEED turf count as vegetation in the 25 % minimum vegetation of outdoor space? Last reply: emily reese moody, Apr 14, 2020, 12:13 pm |
|
Wood donation trackingNC-v4 MRp2: Construction and demolition waste management planningposted by Jacinta Lang on Mar 4, 2020, 3:10 pm
Hi All, We are working on a new construction project in a remote location with no access to recycling facilities. We came up with a plan for donating our... Last reply: Jacinta Lang, Apr 7, 2020, 11:06 am |