Ask about light and views IndexNC-2009 IEQc8.1: Daylight and views - daylightposted by Jose Alfonso Vergara Vasquez on Jul 21, 2016, 11:12 pm
Hi , I wonder what happens when you have more windows than is required and the index exceeds the recommended? Last reply: TODD REED, Jul 22, 2016, 8:07 am |
|
SR Natural stoneNC-v4 SSc5: Heat Island Reductionposted by Juan Carlos Contreras on Jul 19, 2016, 2:59 pm
Hello, Last reply: Summer Minchew, Jul 19, 2016, 3:29 pm |
|
Daylight controlsCI-v4 EAp2: Minimum Energy Performanceposted by Gabriela Crespo on Jul 18, 2016, 1:28 pm
Dear all, We are working on a project to be certified CI v4. The use is a software development office, the building is 100% glazing in a very hot climate. The owner will be installing... Last reply: Gabriela Crespo, Jul 18, 2016, 2:46 pm |
|
Energy Metering for Multi-tenant buildingEBOM-v4 EAc5: Advanced Energy Meteringposted by Gabriela Crespo on Jul 7, 2016, 11:59 am
Dear all, We are working on a LEED EB project that wants to explore this credit, I understand the requirements are to monitor all energy sources, as the pre-requisite states, and... Last reply: Dave Hubka, Jul 7, 2016, 12:38 pm |
|
LEED EAc2 for CampusNC-2009 EAc2: On-Site Renewable Energyposted by Mauricio Ramirez on Mar 15, 2016, 12:51 pm
Hello. I'm working on a Campus project that are designing a large PV installation in the roof and façade of the different building as they are built, but that will cover also areas outside of the... Last reply: Mauricio Ramirez, Jul 1, 2016, 3:44 pm |
|
% of Glazing & Floor Area Base Case vs ProjectCS-2009 EAp2: Minimum Energy Performanceposted by Dana Guzman on Jun 10, 2016, 11:36 pm
Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question. Should the base case scenario and the real project be... Last reply: Christopher Schaffner, Jun 16, 2016, 11:00 pm |
|
Project MexicoNC-2009 RPc1: Regional Priorityposted by Alejandro Macias on Feb 22, 2016, 12:48 pm
Hi! I´m using this link http://www.usgbc.org/rpc to identify the regional priority credits on a project near Oaxaca, Mexico. But if I select BD+C :NC,... Last reply: Eric Bautista, Jun 16, 2016, 10:19 pm |
|
Local food productionPilot-Credits SSpc82: Local food productionposted by Lourdes Salinas on Jun 15, 2016, 7:48 pm
What is the best option of water irrigation systems for a small on site food production? |
|
Base Case vs Project CaseCS-2009 EAp2: Minimum Energy Performanceposted by Dana Guzman on Jun 14, 2016, 6:19 pm
Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2? |
|
DCVEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on May 14, 2016, 5:59 pm
Hallo, I am reading Section 6.2.7 ASHRAE 62.1-2010, and it is not clear to me if the building needs to install DCV. In case this is mandatory, is it required for every tenant? Verbatim... Last reply: Ben Stanley, Jun 13, 2016, 11:12 am |