Log in
Forum
Topic

Gross Floor Area

CI-v4 MPR3: Must comply with project size requirements
posted by Edgar Arevalo on Mar 21, 2024, 3:09 pm

For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage.  Since...

Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Nikhita Sapuram on Aug 8, 2023, 12:03 pm

Most WBLCA software programs do not include product specific data. For a tenant improvement project would it be acceptable to use a program that only looks at environmental impacts from cradle to...

Last reply: Kate Holly, Mar 21, 2024, 2:32 pm

Exterior Illuminated Signage

EBOM-v4 MRc2: Purchasing - lamps
posted by Kristina K on Mar 21, 2024, 11:37 am

Hello,

Does this credit apply to Exterior Illuminated Signage?

Thank you

Total Material Cost

LEED v4.1 Discussion Forum
posted by Arda Buyuklu on Mar 21, 2024, 10:49 am

Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form? How is this relevant for LEED purposes, especially if it is almost always subject to...

Multi-building project- installing renewables on only 1 building

CS-v4 EAc5: Renewable energy production
posted by Shannon Oletic on Jul 5, 2023, 2:56 pm

We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach). Is it acceptable to install the rooftop solar PV system on only one...

Last reply: Shannon Oletic, Mar 20, 2024, 9:55 am

Natural vs mechanical ventilation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Dina El-Sady on Sep 11, 2023, 11:42 pm

A project has a production building with a warehouse and is beinng naturally ventilated with exhaust air louvers and fresh air louvers .The machinery has direct exhaust fans to remove heat...

Last reply: Dina El-Sady, Mar 20, 2024, 5:00 am

PC MRpc87 Feedback

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Dan Ackerstein on Sep 8, 2022, 3:45 am

Feedback from the architecture firm and general contractors re: PC implementation in Southern California

  • The LEED credit language was straightforward and intuitive. The difficult...

Last reply: Michelle Rosenberger, Mar 19, 2024, 12:12 pm

WEp1_manual watering

NC-v4 WEp1: Outdoor water use reduction
posted by ed HvacSimulator on Apr 29, 2022, 3:27 am

Hi, we have a project for NC, they plan to use manual watering system for the landscape outside the house (they have water dispensers available, the staff will discharge into the bucket and water...

Last reply: Santiago Avila, Mar 19, 2024, 5:32 am

"7% for green vehicles "

NC-v4 LTc8: Green vehicles
posted by Santiago Avila on Mar 18, 2024, 10:53 am

"LT Credit Reduced Parking Footprint. Project teams also pursuing the related credit must reserve 12% of total parking capacity for preferred vehicles (with a required 7% for...

Last reply: Santiago Avila, Mar 19, 2024, 5:21 am

No More Strigent Than

NC-v4 EQp2: Environmental tobacco smoke control
posted by Hannah Fleck on May 11, 2017, 4:06 pm

Hello,
I am working on a publicly funded building in the state of Indiana. State law here prohibits smoking within 8 feet of a building. The owner says that can't adopt a policy more...

Last reply: Afogreen Build, Mar 19, 2024, 5:18 am