USGBC approved equivalent to EPA registered pesticidesHomes-v4 SSc3: Nontoxic pest controlposted by Sam Badach on Oct 30, 2020, 12:16 pm
I am preparing the O&M manual as part of credit Non-toxic Pest Control for LEED V4 for Homes. As part of the manual we are instructed to provide an integrated pest management policy which is... |
|
Canadian projectsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Keith Robertson on Feb 6, 2018, 10:45 am
As a canadian project do we also have to complete the survey as part of the documentation? Last reply: Jacqueline Da Rocha, Oct 13, 2020, 12:25 pm |
|
Number of Certified BuildingsND-Plan-v4 GIBc1: Certified green buildingsposted by Tim Nabholz on Oct 8, 2020, 4:33 pm
Hi Eliot, The LEED ND form states that "project includes at least one building, in addition to the building documented under GIB Prerequisite Certified Green Building... Last reply: Eliot Allen, Oct 9, 2020, 12:14 pm |
|
AIA Re-occupancy Assessment Tool- Health Canada equivalent?Pilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Shakir Ismail on Oct 6, 2020, 2:02 pm
We're working on an office building in Ontario pursuing LEED ID+C and I hoped to present this Pilot credit to our client as a reasonable COVID-19 safety strategy. Since my client is federal govt... |
|
Which buildings need to be modeled?ND-Plan-v4 GIBp2: Minimum building energy performanceposted by Tim Nabholz on Sep 29, 2020, 6:40 pm
Hi All, The following is noted in the reference guide after Option 2: AND For new single family residential buildings and new lowrise multifamily buildings, 90% of the... Last reply: Tim Nabholz, Sep 30, 2020, 1:55 pm |
|
Extraction distance to factory and distance from factory to construction site.NC-2009 MRc5: Regional Materialsposted by cedric grenier on Sep 29, 2020, 9:51 am
Hi, I'm having a little bit of trouble understanding exactly what distance they're asking for. It may sound like a bad question but it's an itch I need to scratch. So we call steel from a... |
|
FAR of a retail unit within a Multi-Use BuildingND-Plan-v4 NPDc2: Compact developmentposted by Tim Nabholz on Sep 28, 2020, 6:00 pm
Is there another way to count the... Last reply: Eliot Allen, Sep 28, 2020, 7:27 pm |
|
Number of Commissioning AgentsLEED Canada Forumposted by Dola Onajin on Sep 24, 2020, 11:25 am
Is it okay to have more than one independent... |
|
Non-electric and electric energy use for the Renewable Energy credit version 4.1CI-v4.1 EAc4: Renewable energyposted by Ana Maria Escobar Cardenas on Jul 22, 2020, 9:16 am
Hello! I am doing a substitution of the Renewable Energy (Green Power) credit to version 4.1 for a Commercial Interior project. Last reply: Boone Jones, Sep 15, 2020, 1:24 pm |
|
No cooling tower in design but core and shell spaces modeled as neutral with cooling tower in energy model.Pilot-Credits WEpc94: No Cooling Towerposted by Chris Yates on Sep 7, 2018, 9:48 am
A project I am working on meets all the requirements for the design (no cooling tower, no use of the latent heat of the evaporative cooling of water, no cooling from a District cooling system).... Last reply: Maureen Drullard, Aug 25, 2020, 3:09 pm |