Log in
Forum » Canada
Topic

USGBC approved equivalent to EPA registered pesticides

Homes-v4 SSc3: Nontoxic pest control
posted by Sam Badach on Oct 30, 2020, 12:16 pm

I am preparing the O&M manual as part of credit Non-toxic Pest Control for LEED V4 for Homes. As part of the manual we are instructed to provide an integrated pest management policy which is...

Canadian projects

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Keith Robertson on Feb 6, 2018, 10:45 am

As a canadian project do we also have to complete the survey as part of the documentation?

Last reply: Jacqueline Da Rocha, Oct 13, 2020, 12:25 pm

Number of Certified Buildings

ND-Plan-v4 GIBc1: Certified green buildings
posted by Tim Nabholz on Oct 8, 2020, 4:33 pm

Hi Eliot,

The LEED ND form states that "project includes at least one building, in addition to the building documented under GIB Prerequisite Certified Green Building...

Last reply: Eliot Allen, Oct 9, 2020, 12:14 pm

AIA Re-occupancy Assessment Tool- Health Canada equivalent?

Pilot-Credits INpc136: Safety First: Re-Enter Your Workspace
posted by Shakir Ismail on Oct 6, 2020, 2:02 pm

We're working on an office building in Ontario pursuing LEED ID+C and I hoped to present this Pilot credit to our client as a reasonable COVID-19 safety strategy. Since my client is federal govt...

Which buildings need to be modeled?

ND-Plan-v4 GIBp2: Minimum building energy performance
posted by Tim Nabholz on Sep 29, 2020, 6:40 pm

Hi All,

The following is noted in the reference guide after Option 2:

AND For new single family residential buildings and new lowrise multifamily buildings, 90% of the...

Last reply: Tim Nabholz, Sep 30, 2020, 1:55 pm

Extraction distance to factory and distance from factory to construction site.

NC-2009 MRc5: Regional Materials
posted by cedric grenier on Sep 29, 2020, 9:51 am

Hi, I'm having a little bit of trouble understanding exactly what distance they're asking for. It may sound like a bad question but it's an itch I need to scratch.

So we call steel from a...

FAR of a retail unit within a Multi-Use Building

ND-Plan-v4 NPDc2: Compact development
posted by Tim Nabholz on Sep 28, 2020, 6:00 pm

Is there another way to count the...

Last reply: Eliot Allen, Sep 28, 2020, 7:27 pm

Number of Commissioning Agents

LEED Canada Forum
posted by Dola Onajin on Sep 24, 2020, 11:25 am

Is it okay to have more than one independent...

Non-electric and electric energy use for the Renewable Energy credit version 4.1

CI-v4.1 EAc4: Renewable energy
posted by Ana Maria Escobar Cardenas on Jul 22, 2020, 9:16 am

Hello! 

I am doing a substitution of the Renewable Energy (Green Power) credit to version 4.1 for a Commercial Interior project. 
I used TABLE 2....

Last reply: Boone Jones, Sep 15, 2020, 1:24 pm

No cooling tower in design but core and shell spaces modeled as neutral with cooling tower in energy model.

Pilot-Credits WEpc94: No Cooling Tower
posted by Chris Yates on Sep 7, 2018, 9:48 am

A project I am working on meets all the requirements for the design (no cooling tower, no use of the latent heat of the evaporative cooling of water, no cooling from a District cooling system)....

Last reply: Maureen Drullard, Aug 25, 2020, 3:09 pm